My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1. 628 Park Avenue_COA 2022-0223
sbend
>
Public
>
Historic Preservation
>
2022
>
April
>
SPECIAL MEETING 2022-0411
>
1. 628 Park Avenue_COA 2022-0223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 12:47:37 PM
Creation date
4/11/2022 4:42:31 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
628 Park Avenue
HPC Document Type
Certification
HPC Local Historic District
ix. Chapin Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
all Greentree workers are licensed abatement workers. In the event structural items that cannot be removed contain lead, the lead <br />abatement procedure indicated above may be changed to liquid encapsulation instead of removal (in most cases, these items will be <br />covered with aluminum trim during the general construction phase). <br /> <br />The total estimated cost for the proposed work indicated above is $8,434.38. <br /> <br />A third-party clearance exam will be required upon completion of the abatement work. Greentree cannot perform this <br />clearance in accordance with HUD guidelines, but will hire a licensed third-party inspection company at an additional fee and <br />separate cost of $350.00 <br />*Removal and replacement is recommended for window sills as they are considered "chewable surfaces." <br /> <br />Please note: This estimate is only for abatement and clean-up to clearance levels or below. This is not a cosmetic improvement, but an <br />environmental hazard reduction activity. Though some cosmetic improvement may occur, this is not Greentree’s intended result. Our <br />purpose is to provide a safe, clean, green environment. All square footage is approximate. <br /> <br />Areas listed on the original inspection report as “negative” for lead-based paint will not be painted. Also, areas listed as “positive” <br />and “intact” will not be treated as they are in acceptable condition per HUD guidelines. Only the areas listed above will be treated <br />during this project. In addition, this estimate does not include inaccessible areas, which may be made accessible and tested at a later <br />time. <br /> <br />No contractor is to conduct work of any kind on this property until the lead -based paint stabilization or abatement work is complete as <br />their work may conflict with and jeopardize the clearance exam. Greentree reserves the right to stop work at any time if this <br />stipulation is violated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.