My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Edit to MWBE Program Info edited 3.21.22 (003)
sbend
>
Public
>
Inclusive Procurement and Contracting Board (MBE/WBE)
>
Agendas & Packets
>
2022
>
03-24-2022
>
Edit to MWBE Program Info edited 3.21.22 (003)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 2:10:13 PM
Creation date
3/22/2022 4:00:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(1) Solicit through all reasonable and available means (e.g., attendance at pre-bid <br />meetings, advertising and written notices) the interest of all MWBEs in the scopes of <br />work of the contract. The contractor shall provide interested MWBEs with timely, <br />adequate information about the plans, specifications, and requirements of the contract <br />to allow such firms to respond to the solicitation. The bidder must follow up initial <br />solicitations with interested MWBEs. <br />(2) Select portions of the work to be performed by MWBEs in order to increase the <br />likelihood that the contract goal will be achieved. This includes, where appropriate, <br />breaking out contract work items into economically feasible units to facilitate <br />participation, even when the bidder would otherwise prefer to perform these work <br />items with its own forces. It is the bidder’s responsibility to make a portion of the work <br />available to MWBEs and to select those portions of the work or material needs <br />consistent with the availability of such firms to facilitate their participation. <br />(3) Negotiate in good faith with interested MWBEs. Evidence of such negotiation <br />includes the names, addresses, and telephone numbers of firms that were contacted; a <br />description of the information provided regarding the plans and specifications for the <br />work selected for subcontracting; and why agreements could not be reached. The <br />bidder may not reject MWBEs as being unqualified without sound reasons based on a <br />thorough investigation of their capabilities. That there may be some additional costs <br />involved in finding and using MWBEs is not in itself sufficient reason for a bidder’s <br />failure to meet the contract goal, as long as such costs are reasonable. The ability or <br />desire of a bidder to perform the work of a Contract with its own organization does not <br />relieve it of the responsibility to make good faith efforts on all scopes of work within <br />which subcontracting opportunities are available. <br />(4) Make efforts to assist interested MWBEs in obtaining bonding, lines of credit, or <br />insurance as required by the City or the bidder, where appropriate. <br />(5) Make efforts to assist interested MWBEs in obtaining necessary equipment, supplies, <br />materials, or related assistance or services, where appropriate. <br />Materials that should be submitted to support a contractor’s good faith efforts include: <br />• Copies of advertisements, notices, or solicitations from contractor to <br />MWBE’s-- to include date and time of issuance; <br />• A list of all locations where advertisements or notices to MWBE’s were <br />placed or solicitations sent; <br />• Copies of communication between contractor and MWBE’s in response to <br />contractor’s advertisements, notices, or solicitations; <br />• Proof of contractor’s break-out of contract items into units feasible for <br />performance by MWWMBE’s;
The URL can be used to link to this page
Your browser does not support the video tag.