Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME: 2022 Contractor Paving Round 1 <br />PROJECT NO. 122-008 _ <br />FOR BIDS DUE: March 22, 2022, 9:00am, Local Time <br />CONTRACTOR NAME: Milestone Contractors North, Inc. <br />Alternate #1 <br />Item <br />No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />15,000.00 <br />$15,000.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />6,053.20 <br />$6,053.20 <br />3 <br />Milling, 2" <br />18016 <br />SY <br />4.50 <br />$81,072.00 <br />4 <br />HMA Surface, 9.5 mm —Type B <br />1982 <br />TONS <br />99.00 <br />$196,218.00 <br />5 <br />HMA for Patching <br />228 <br />TONS <br />225.00 <br />$51,300.00 <br />6 <br />Tack Coat <br />6 <br />TONS <br />1.00 <br />$6.00 <br />7 <br />Joint Adhesive, Surface <br />14036 <br />LF <br />0.30 <br />$4,210.80 <br />8 <br />Adjust Manhole to Grade <br />6 <br />EA <br />2,500.00 <br />$15,000.00 <br />9 <br />Adjust Water Valve Structure to Grade <br />1 <br />EA <br />100.00 <br />$100.00 <br />10 <br />Adjust Inlet to Grade <br />10 <br />EA <br />2,500.00 <br />$25,000.00 <br />11 <br />Concrete Curb Ramp, Removal <br />272 <br />SY <br />100.00 <br />$27,200.00 <br />12 <br />Concrete Curb Ramp, Installation <br />272 <br />SY <br />220.00 <br />$59,840.00 <br />13 <br />Concrete Curb, Replacement <br />512 <br />LF <br />125.00 <br />$64,000.00 <br />Alternate 1 Total <br />$545,000.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 9 <br />