My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2. Riverside Drive Embankment_COA 2022-0225A
sbend
>
Public
>
Historic Preservation
>
2022
>
March
>
2. Riverside Drive Embankment_COA 2022-0225A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 1:25:26 PM
Creation date
3/16/2022 1:21:09 PM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Certification
HPC Local Historic District
iii. Riverside Drive
Text box
ID:
1
Creator:
Created:
3/16/2022 1:24 PM
Modified:
3/16/2022 1:24 PM
Text:
https://www.in.gov/dnr/fish-and-wildlife/files/fw-LARE_BE_WLT_Funding_FY_2018-2019.pdf
ID:
2
Creator:
Created:
3/16/2022 1:24 PM
Modified:
3/16/2022 1:24 PM
Text:
https://www.in.gov/dnr/fish-and-wildlife/files/fw-LARE_Watershed_Land_Treatment_Biological_and_Engineering_-Projects_Funding_FY-2019-20.pdf
ID:
3
Creator:
Created:
3/16/2022 1:24 PM
Modified:
3/16/2022 1:24 PM
Text:
https://www.in.gov/dnr/fish-and-wildlife/files/fw-LARE_Watershed_Land_Treatment_Biological_and_Engineering_-Projects_Funding_FY-2019-20.pdf
ID:
4
Creator:
Created:
3/16/2022 1:24 PM
Modified:
3/16/2022 1:24 PM
Text:
https://www.glc.org/news/glsnrp-093021
ID:
5
Creator:
Created:
3/16/2022 1:24 PM
Modified:
3/16/2022 1:24 PM
Text:
https://larereports.dnr.in.gov/
ID:
6
Creator:
Created:
3/16/2022 1:24 PM
Modified:
3/16/2022 1:24 PM
Text:
https://larereports.dnr.in.gov/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Page | 2 <br />Construction Schedule: <br /> <br />The tree removal work for the bat habitat trees is anticipated to begin March 14th thru April 1st. The <br />remainder of the work is expected to begin in August 2022 and the bank will be stabilized by Fall 2022. <br />The City has received all other permits to perform the work. The City awarded the project to Milestone <br />Contractors North, Inc. for over $800k (with $200k coming from the Great Lakes Commission and the <br />remainder funded from the Stormwater Utility Fees paid for by City of South Bend constituents). Plans <br />for the project are included in Exhibit B. This project will not only improve the water quality of St. <br />Joseph River but will also provide a healthy wildlife and vegetative habitat, protect the property owner’s <br />property from further deterioration, and provide stability and protection to the public infrastructure and <br />roadway. <br /> <br />I, along with the Great Lakes Commission and the Indiana Department of Natural Resources, are <br />thrilled about the implementation of this project and all the benefits it will have on the community. <br /> <br /> <br />Sincerely, <br /> <br /> <br /> <br />Sue Ellen Doudrick, PE <br />Assistant City Engineer <br />City of South Bend <br /> <br /> <br />References: <br />1) Grants: <br />a. IDNR Grant https://www.in.gov/dnr/fish-and-wildlife/files/fw-LARE_BE_WLT_Funding_FY_2018-2019.pdf <br />b. IDNR Grant https://www.in.gov/dnr/fish-and-wildlife/files/fw- <br />LARE_Watershed_Land_Treatment_Biological_and_Engineering_-Projects_Funding_FY-2019-20.pdf <br />c. Great Lakes Commission Grant https://www.glc.org/news/glsnrp-093021 <br />2) IDNR LARE Grant Reports and Public Meeting Documents <br />a. Pg. 14 of 2020 Report: https://larereports.dnr.in.gov/ <br />b. Pg. 5 of 2019 Report: https://larereports.dnr.in.gov/ <br /> <br />Exhibits: <br />A) Right of Entry Agreements from property owners <br />B) Riverside Drive Bank Stabilization Construction Plans <br /> <br />2018 Picture: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.