Laserfiche WebLink
Rose StEngineer's Line Item BreakdownCounty CityCounty City1Maintenance of Traffic0.20 0.80LS$6,136.04 $1,227.21 $4,908.832Mobilization and Demobilization0.20 0.80LS$5,871.72 $1,174.34 $4,697.373Milling, 3"1305 5780SY$2.90 $3,784.50 $16,762.004HMA Surface, 9.5 mm – Type B215 954TONS$74.50 $16,041.71 $71,050.655HMA for Patching040TONS$86.50 $0.00 $3,460.006Tack Coat0.36 1.64TONS$1.00 $0.36 $1.647Joint Adhesive, Surface514 2344LF$0.70 $360.11 $1,640.498Adjust Manhole to Grade17EA$200.00 $200.00 $1,400.009Adjust Water Valve Structure to Grade14EA$100.00 $100.00 $400.0010Adjust Inlet to Grade37LF$200.00 $600.00 $1,400.0011Transverse Marking, Thermoplastic, Solid, White, 24"24 40LF$7.25 $174.00 $290.00$23,662.23 $106,010.9880%20%City OwnedCounty OwnedContractor's Bid PricesRose St from Maple Ln to Crestwood BlvdRose St TotalQuantityCostUnitUnit PriceLine ItemItem No. Page 3 of 3