My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Safe Routes to School - Our Lady of Hungary Neighborhood Proj No. 122-007 - Abonmarche
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Safe Routes to School - Our Lady of Hungary Neighborhood Proj No. 122-007 - Abonmarche
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 2:27:40 PM
Creation date
3/8/2022 2:27:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> ENGINEERING • ARCHITECTURE • LAND SURVEYING <br />QUALIFICATIONS <br />This project was a joint effort between the City of Goshen, Goshen <br />Community Schools, and the Indiana Department of Transportation <br />(INDOT) to alleviate safety concerns at the existing crossing located at <br />Plymouth Avenue (SR 119) and Indiana Avenue. The existing crossing is <br />used by students as well as the community to access Shanklin Park and <br />the Mill Race Canal to the east. To help alleviate safety concerns, a mid- <br />block crossing was added to the west, closer to the exit of the school <br />parking lot on Plymouth Avenue. <br /> <br />Abonmarche provided topographic survey, conceptual layouts and cost <br />estimates, and engineering to incorporate the mid-block crossing (safety <br />island) with rapid flasher beacons. This work also included design of new <br />concrete curbing along both sides of the road with new storm sewer <br />inlets and piping, and stormwater treatment prior to discharge. A new <br />sidewalk/path was designed from Indiana Avenue along the school <br />property to the mid-block safety island, crossed over and continued on <br />the north side to connect to the City's existing trail. Cross-walk <br />improvements at Indiana Avenue were re-designed to improve <br />pedestrian visibility and provide a larger wait area for students leaving <br />school, and incorporated both a new push-button pedestal and push- <br />buttons on existing signal poles. The project also included preparing <br />several easements along the north side of Plymouth Avenue for the <br />sidewalk/path and a new sanitary sewer to service the existing homes. <br />Other project elements included traffic and pedestrian signage, <br />preparing legal descriptions for additional right-of-way, coordination with <br />INDOT and utility companies, and potholing a main line gas main to help <br />design the placement of new storm sewer inlet locations. <br />PLYMOUTH AVENUE (SR 19) TRAIL MODIFICATION CROSSING <br />GOSHEN, INDIANA <br />CLIENT <br />City of Goshen <br /> <br />COST <br />$764,000 <br /> <br />HIGHLIGHTS <br />· New Mid-Block Pedestrian <br />Crossing <br />· Rapid Flasher Beacons <br />· INDOT Coordination and <br />Permitting <br />· New Storm Sewer and <br />Treatment <br />· Sanitary Sewer Design <br />· Easement Preparation <br />· Traffic Signage for Crossing <br />7
The URL can be used to link to this page
Your browser does not support the video tag.