Laserfiche WebLink
<br /> <br /> <br />Mr. Andrew Netter February 7, 2022 <br />South Bend Community Investment <br />14th Floor County-City Building <br />227 West Jefferson Blvd. <br />South Bend, Indiana 46601 <br /> <br />Re: Preparation of an ALTA Survey for 215 MLK Jr. Blvd., <br /> South Bend, Indiana: <br /> <br />Dear Mr. Netter: <br /> <br /> Please accept this letter as our written cost proposal to provide you with Survey services to <br />prepare an ALTA Survey for property located at 215 Martin Luther King, Jr. Blvd., (MLK Jr. <br />Blvd.), South Bend, Indiana. The ALTA survey would include items 1-4, 6, 8, 10 and 11 (a)(b), <br />16, 18 and 19 from Table “A” of the revised ALTA/ASCM Land Title Survey Minimum <br />Standard Detail Requirements effective 2021. The ALTA Survey will show easements of record <br />that affect the property based on provided title work. We will also show any marked utility lines <br />which are visible or have been marked. We would ask that the owner request utilities to be <br />marked for the site. <br /> Our cost estimate for the survey work is shown below: <br /> <br />A). ALTA Survey; <br /> <br />1). The cost for the preparation of an ALTA Survey including items 1-4, 6, 8, 10 and 11 (a)(b), <br />16, 18 and 19 from Table “A” of the revised ALTA/ASCM Land Title Survey Minimum <br />Standard Detail Requirements effective 2021. The ALTA Survey will show easements of record <br />that affect the property based on provided title work would be……………….…………...$ 3,550; <br /> <br /> (Any requested drawing revisions would be done at our standard hourly rates, which are <br />attached.) <br /> <br /> <br />If this proposal is acceptable, our schedule at the present time would be to have a crew on-site <br />within 30-35 working days with permitting weather. The drawing would be sent within 3-5 <br />working days or less at the completion of the field work. <br /> <br />