Laserfiche WebLink
Manhour Fee Justification <br />Client:City of South Bend <br />Project Name: <br />Project No.:22-1089 <br />Rainbow Drive Improvements <br />Manhour Justification <br />Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObservorAdmin2 Man Survey Crew1 Man Survey Crew Task Description Totals Total Fee <br />Task 1 30% -50% Design Submission 8 30 0 56 0 0 0 0 0 94 10,990$ <br />1 Title Sheet 2 210$ <br />2 Index Sheet 2 210$ <br />3 Preliminary Typical Cross Sections 4 420$ <br />4 Preliminary MOT/Pedestrian plans with Signage and note 4 420$ <br />5 Plan and Profile on Aerial Mapping showing exist./prop. elev's for <br />ramps and pavement, show flow arrows to nearby inlets 6 630$ <br />6 Configuration of curb ramps 2 2 460$ <br />7 Preliminary Erosion Control Plans 2 4 670$ <br />8 Preliminary Pavement Marking and Signage Plan 2 2 460$ <br />9 Miscellaneous details, driveway replacement table, structure <br />replacement table/ incidental work.2 2 460$ <br />10 NO CROSS_SECTIONS 2 210$ <br />11 Preliminary Quantity Calcs and Cost Estimates 2 2 460$ <br />12 Preliminary Permit Application- Rule 5 4 420$ <br />13 Preliminary Unique Special Provisions 2 2 460$ <br />14 Site Visit 6 6 1,380$ <br />15 Project Management 2 250$ <br />16 Initiate Utility Coordination (Design Inquiry and Verification)4 420$ <br />17 QA/QC time 8 1,360$ <br />18 Mtg with City review / 1 visit PM/Designer visit 6 6 1,380$ <br />19 Compliance with City at 50% Review 4 2 710$ <br />-$ <br />Task 2 100 % Design Submission 0 34 0 46 0 0 0 0 0 80 9,080$ <br />20 Final Title Sheet/obtain signatures of PWD 2 210$ <br />21 Finalize Index Sheet with Pertinent Utility Information 2 210$ <br />22 Typical Cross Sections 2 210$ <br />23 Finalize MOT/Pedestrian plans with Signage and note 2 6 880$ <br />24 Final Plan and Profile on Aerial Mapping showing exist./prop. elev's <br />for ramps and pavement, show flow arrows to nearby inlets 2 6 880$ <br />25 Fnal details of curb ramps 4 420$ <br />Revised 22-1089 South Bend 2022 Road Rehab - Rainbow Dr Fee JTA.xlsx 3 of 6