My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - 2022 Community Crossings Road Rehab Proj No. 122-024 -A&Z Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - 2022 Community Crossings Road Rehab Proj No. 122-024 -A&Z Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 4:28:31 PM
Creation date
2/22/2022 4:27:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Manhour Fee Justification <br />Client:City of South Bend <br />Project Name: <br />Project No.:22-1089 <br />Eastmont Drive Improvements <br />Manhour Justification <br />Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObservorAdmin2 Man Survey Crew1 Man Survey Crew Task Description Totals Total Fee <br />Task 1 30%-50% Design Submission 16 34 102 138 0 0 0 0 0 290 33,190$ <br />1 Title Sheet 2 2 440$ <br />2 Index Sheet 2 2 440$ <br />3 Preliminary Typical Cross Sections 4 12 1,720$ <br />4 Preliminary MOT/Pedestrian plans with Signage and note 8 16 2,600$ <br />5 Plan and Profile on Aerial Mapping showing exist./prop. elev's for <br />ramps and pavement, show flow arrows to nearby inlets 8 34 4,490$ <br />6 Configuration of curb ramps 8 16 2,600$ <br />7 Preliminary Erosion Control Plans 4 8 1,300$ <br />8 Preliminary Pavement Marking and Signage Plan 8 12 2,180$ <br />9 Miscellaneous details, driveway replacement table, structure <br />replacement table/ incidental work.4 8 1,300$ <br />10 NO CROSS_SECTIONS -$ <br />11 Preliminary Quantity Calcs and Cost Estimates 4 8 1,420$ <br />12 Preliminary Permit Application- Rule 5 4 12 1,720$ <br />13 Preliminary Unique Special Provisions 4 4 960$ <br />14 Site Visit 8 8 1,920$ <br />15 Project Management 8 1,000$ <br />16 Initiate Utility Coordination (Design Inquiry and Verification)16 1,840$ <br />17 QA/QC time 16 2,720$ <br />18 Mtg with City review / 1 visit PM/Designer visit 6 6 1,440$ <br />19 Compliance with City at 50% Review 4 8 16 3,100$ <br />-$ <br />Task 2 100 % Design Submission 0 60 137 142 0 0 0 0 0 339 38,165$ <br />20 Final Title Sheet/obtain signatures of PWD 1 2 325$ <br />21 Finalize Index Sheet with Pertinent Utility Information 2 4 650$ <br />22 Typical Cross Sections 4 8 1,300$ <br />23 Finalize MOT/Pedestrian plans with Signage and note 12 24 3,900$ <br />24 Final Plan and Profile on Aerial Mapping showing exist./prop. elev's <br />for ramps and pavement, show flow arrows to nearby inlets 12 32 4,740$ <br />25 Fnal details of curb ramps 32 12 4,940$ <br />Revised 22-1089 South Bend 2022 Road Rehab - Eastmont Dr Fee NT.xlsx 3 of 6
The URL can be used to link to this page
Your browser does not support the video tag.