Laserfiche WebLink
PROJECT:SOUTH BEND 2022 ROAD REHAB Created By:LSG Checked by: <br />STREET:RAINBOW DRIVE (SOUTHLEA DR TO CUL-DE-SAC)Date:12/16/2021 Date Checked: <br />MATERIAL:ASPHALT PAVEMENT <br />QUANTITY UNIT UNIT COST ITEM COST <br />1 CONSTRUCTION ENGINEERING (2%)1.00 LS $4,200.00 $4,200.00 <br />2 MOBILIZATION AND DEMOBILIZATION (5%)1.00 LS $10,400.00 $10,400.00 <br />3 CLEARING RIGHT OF WAY (1%)1.00 LS $2,100.00 $2,100.00 <br />4 CONCRETE PAVEMENT REMOVAL 2371.00 SYS $9.00 $21,339.00 <br />5 SUBGRADE TREATMENT, TYPE II 3025.00 SYS $13.00 $39,325.00 <br />6 SUBBASE NO. 53 947.00 TON $24.00 $22,728.00 <br />7 HMA SURFACE, TYPE B 196.00 TON $75.00 $14,700.00 <br />8 HMA INTERMEDIATE, TYPE B 327.00 TON $70.00 $22,890.00 <br />9 HMA BASE, TYPE B 522.00 TON $65.00 $33,930.00 <br />10 CURB RAMP CONCRETE 33.00 SYS $175.00 $5,775.00 <br />11 DETECTABLE WARNING SURFACES 4.00 SYS $205.00 $820.00 <br />12 COMBINATION CURB & GUTTER, TYPE A 1412.00 LFT $21.00 $29,652.00 <br />13 PCCP FOR APPROACHES, 6 IN 183.00 SYS $67.00 $12,261.00 <br />14 MULCHED SEEDING U 298.00 SYS $2.00 $596.00 <br />15 TOPSOIL 17.00 CYS $80.00 $1,360.00 <br />16 CASTING, FURNISH & ADJUST TO GRADE 2.00 EACH $1,250.00 $2,500.00 <br />17 MAINTAINING TRAFFIC (3%)1.00 LS $6,200.00 $6,200.00 <br />CONTINGENCY (20%)1.00 LS $41,600.00 $41,600.00 <br />Total Cost Estimate $272,376.00 <br />DESCRIPTIONItem No. <br />PROBABLE CONSTRUCTION COST ESTIMATE