Laserfiche WebLink
PROJECT:SOUTH BEND 2022 ROAD REHAB Created By:LSG Checked by: <br />STREET:SOUTHLEA DRIVE (LILAC RD TO EASTMONT DR)Date:12/16/2021 Date Checked: <br />MATERIAL:ASPHALT PAVEMENT <br />QUANTITY UNIT UNIT COST ITEM COST <br />1 CONSTRUCTION ENGINEERING (2%)1.00 LS $7,600.00 $7,600.00 <br />2 MOBILIZATION AND DEMOBILIZATION (5%)1.00 LS $18,900.00 $18,900.00 <br />3 CLEARING RIGHT OF WAY (1%)1.00 LS $3,800.00 $3,800.00 <br />4 CONCRETE PAVEMENT REMOVAL 4057.00 SYS $9.00 $36,513.00 <br />5 SUBGRADE TREATMENT, TYPE II 5353.00 SYS $13.00 $69,589.00 <br />6 SUBBASE NO. 53 1650.00 TON $24.00 $39,600.00 <br />7 HMA SURFACE, TYPE B 335.00 TON $75.00 $25,125.00 <br />8 HMA INTERMEDIATE, TYPE B 558.00 TON $70.00 $39,060.00 <br />9 HMA BASE, TYPE B 893.00 TON $65.00 $58,045.00 <br />10 CURB RAMP CONCRETE 71.00 SYS $175.00 $12,425.00 <br />11 DETECTABLE WARNING SURFACES 11.00 SYS $205.00 $2,255.00 <br />12 COMBINATION CURB & GUTTER, TYPE A 2688.00 LFT $21.00 $56,448.00 <br />13 PCCP FOR APPROACHES, 6 IN 400.00 SYS $67.00 $26,800.00 <br />14 MULCHED SEEDING U 607.00 SYS $2.00 $1,214.00 <br />15 TOPSOIL 34.00 CYS $80.00 $2,720.00 <br />16 CASTING, FURNISH & ADJUST TO GRADE 7.00 EACH $1,250.00 $8,750.00 <br />17 MAINTAINING TRAFFIC (3%)1.00 LS $11,400.00 $11,400.00 <br />CONTINGENCY (20%)1.00 LS $75,700.00 $75,700.00 <br />Total Cost Estimate $495,944.00 <br />DESCRIPTIONItem No. <br />PROBABLE CONSTRUCTION COST ESTIMATE