Laserfiche WebLink
PROJECT:SOUTH BEND 2022 ROAD REHAB Created By:LSG Checked by: <br />STREET:EASTMONT DRIVE (RIVERSIDE DR TO NORTHLEA DR)Date:12/17/2021 Date Checked: <br />MATERIAL:ASPHALT PAVEMENT <br />QUANTITY UNIT UNIT COST ITEM COST <br />1 CONSTRUCTION ENGINEERING (2%)1.00 LS $14,200.00 $14,200.00 <br />2 MOBILIZATION AND DEMOBILIZATION (5%)1.00 LS $35,400.00 $35,400.00 <br />3 CLEARING RIGHT OF WAY (1%)1.00 LS $7,100.00 $7,100.00 <br />4 CONCRETE PAVEMENT REMOVAL 7713.00 SYS $9.00 $69,417.00 <br />5 SUBGRADE TREATMENT, TYPE II 9918.00 SYS $13.00 $128,934.00 <br />6 SUBBASE NO. 53 3089.00 TON $24.00 $74,136.00 <br />7 HMA SURFACE, TYPE B 637.00 TON $75.00 $47,775.00 <br />8 HMA INTERMEDIATE, TYPE B 1061.00 TON $70.00 $74,270.00 <br />9 HMA BASE, TYPE B 1697.00 TON $65.00 $110,305.00 <br />10 CURB RAMP CONCRETE 207.00 SYS $175.00 $36,225.00 <br />11 DETECTABLE WARNING SURFACES 26.00 SYS $205.00 $5,330.00 <br />12 COMBINATION CURB & GUTTER, TYPE A 4683.00 LFT $21.00 $98,343.00 <br />13 PCCP FOR APPROACHES, 6 IN 644.00 SYS $67.00 $43,148.00 <br />14 MULCHED SEEDING U 1044.00 SYS $2.00 $2,088.00 <br />15 TOPSOIL 58.00 CYS $80.00 $4,640.00 <br />16 CASTING, FURNISH & ADJUST TO GRADE 11.00 EACH $1,250.00 $13,750.00 <br />17 MAINTAINING TRAFFIC (3%)1.00 LS $21,300.00 $21,300.00 <br />CONTINGENCY (20%)1.00 LS $141,700.00 $141,700.00 <br />Total Cost Estimate $928,061.00 <br />DESCRIPTIONItem No. <br />PROBABLE CONSTRUCTION COST ESTIMATE