My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - 2022 Community Crossings Road Rehab Proj No. 122-024 -A&Z Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - 2022 Community Crossings Road Rehab Proj No. 122-024 -A&Z Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 4:28:31 PM
Creation date
2/22/2022 4:27:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT A, consisting of 5 pages, referred to in and <br />part of the Agreement between Owner and Engineer for <br />Professional Services dated , . <br />Engineer’s Services <br /> <br /> <br /> <br /> <br /> <br /> phase, and review them with Owner. Within 7 calendar days of receipt, Owner shall <br />4. Furnish 2 review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within 30 and 75 calendar days of authorization to proceed with this <br />categories which comprise Total Project Costs. <br />3. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various cost <br />right of way. <br />remain), curb ramps, observed structures and marked utilities will be surveyed within the <br />A1.01 A. a through e, centerline profile, curb flow line and the front edge of sidewalk (to <br />City’s latest GIS mapping will be used as background for plan development. For projects in <br />Coordinate System, St. Joseph projection. Vertical control will be in NAVD 1988 via Opus. <br />observations and as-built plans. Topographic work will be carried out in Indiana Geospatial <br />1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners, field <br />A1.02 Preliminary Design Phase (30-50% design) <br /> Upon written authorization from Owner, Enginer shall: <br /> A. <br />A. 1.01 List of Projects: Engineer shall undertake design of the following Owner identified projects <br />unless otherwised notified by Owner: <br />a.Jackson Road Between Fellows Street and Miami Street <br />b.Eastmont Drive Between Riverside Drive and Northlea Drive <br />c.Rainbow Drive Between Southlea Drive and Cul De Sac <br />d. Southlea Drive Between Lilac Drive and Eastmont Drive <br />e.Hill Street Between Jefferson Boulevard and Colfax Avenue <br />PART 1 – BASIC SERVICES <br />Engineer shall provide Basic and Additional Services as set forth below. <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties.
The URL can be used to link to this page
Your browser does not support the video tag.