My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - 2022 Community Crossings Road Rehab Proj No. 122-024 -A&Z Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - 2022 Community Crossings Road Rehab Proj No. 122-024 -A&Z Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 4:28:31 PM
Creation date
2/22/2022 4:27:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 5 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />I. Engineer neither guarantees the performance of any Contractor nor assumes responsibility for any <br />Contractor’s failure to furnish and perform the Work in accordance with the Contract Documents. <br />J. Engineer shall not provide or have any responsibility for surety bonding or insurance-related advice, <br />recommendations, counseling, or research, or enforcement of construction insurance or surety <br />bonding requirements. <br />K. Engineer shall not be responsible for the acts or omissions of any Contractor, Subcontractor, or <br />Supplier, or of any of their agents or employees or of any other persons (except Engineer’s own <br />agents, employees, and Consultants) at the Site or otherwise furnishing or performing any Work; <br />or for any decision made regarding the Contract Documents, or any application, interpretation, or <br />clarification, of the Contract Documents, other than those made by Engineer. <br />L. While at the Site, Engineer's employees and representatives shall comply with the specific <br />applicable requirements of Contractor's and Owner's safety programs of which Engineer has been <br />informed in writing. <br />6.02 Design Without Construction Phase Services <br />A. Engineer shall be responsible only for those Construction Phase services expressly required of <br />Engineer in Exhibit A, Paragraph A1.05. With the exception of such expressly required <br />services, Engineer shall have no design, Shop Drawing review, or other obligations during <br />construction and Owner assumes all responsibility for the application and interpretation of the <br />Contract Documents, review and response to Contractor claims, contract administration, processing <br />Change Orders, revisions to the Contract Documents during construction, construction surety <br />bonding and insurance requirements, construction observation and review, review of payment <br />applications, and all other necessary Construction Phase engineering and professional services. <br />Owner waives all claims against the Engineer that may be connected in any way to Construction <br />Phase engineering or professional services except for those services that are expressly required of <br />Engineer in Exhibit A, Paragraph A1.05. <br />6.03 Use of Documents <br />A. The Owner acknowledges the Engineer’s construction documents, including all electronic files, as <br />instruments of professional services. Nevertheless, the final construction documents, including all <br />electronic files, prepared under this agreement shall become the property of the Owner upon <br />completion of services and payment in full of all monies due to the Engineer. The Owner shall not <br />reuse or make any modification to the construction documents without the prior written <br />authorization of the Engineer. All Documents are instruments of service in respect to this Project, <br />and Engineer shall retain an ownership and property interest therein (including the copyright and <br />the right of reuse at the discretion of the Engineer) whether or not the Project is completed. Owner <br />shall not rely in any way on any Document unless it is in printed form, signed or sealed by the <br />Engineer or one of its Consultants. <br />B. Either party to this Agreement may rely that data or information set forth on paper (also known as <br />hard copies) that the party receives from the other party by mail, hand delivery, or facsimile, are the <br />items that the other party intended to send. Files in electronic media format of text, data, graphics, <br />or other types that are furnished by one party to the other are furnished only for convenience, not <br />reliance by the receiving party. Any conclusion or information obtained or derived from such
The URL can be used to link to this page
Your browser does not support the video tag.