Laserfiche WebLink
Seitz Park Reconstruction ‐ Amendment No 5 Fee Summary <br />Phase 1 ‐ North Riverwalk, Seitz Park & East Race Floating Dock <br />Original Anticipated 16 month construction schedule (March 2021‐June 2022)  <br />Current Contractor Schedule (March 2021‐July 2023) <br />Hours Analysis <br />Hrs Avg Hrs/Wk Avg Hrs/Month <br />Total SG Budgeted Labor Hours 720 10.4 45 <br />Spent SG Labor Hours thru Dec  <br />2021 478 11.1 47.8 <br />% of budgeted hours spent 66% <br />CA Fee Analysis <br />Total CA Fee for Phase 1 127,400.00$            <br />CA Fee Spent thru Nov 2021 100,568.64$           79% spent <br />Remaining CA Fee 26,831.36$             21%remaining <br />Estimated % of construction remaining 75% <br />Updated Construction Schedule 12/16/21 per Contractor <br />Final Completion 7/6/2023 <br />Additional months 10 Assume 2 months of winter shutdown (limited work) <br />Estimated Add'l  <br />CA Fee <br />Additional hours based on original  <br />estimate of monthly avg hrs (45  <br />hrs) for add'l 10 months <br />450 hrs 67,500.00$         <br />Owner Requested Changes Fee <br />Pavilion Restroom Re‐design $2,666.00 <br />Shade/Hammock Re‐design $1,800.00 <br />Cascades ERS Assistance $2,990.00 <br />Subtotal Design Changes = $7,456.00 <br />TOTAL AMENDMENT No. 5 FEE SUMMARY = $74,956