Laserfiche WebLink
10 SJCA | City of South Bend | Safe Routes to School | DES 1900447 <br />PROJECT EXPERIENCE <br />SR 1 RECONSTRUCTION | <br />WAYNE COUNTY <br />This project included a 0.53 mile urban section with <br />curbs and sidewalks through the Town of Milton and <br />a 0.25 mile rural section south of Milton. The existing <br />two lane pavement was widened within Milton to <br />provide a parking lane along the east side. There <br />were eight intersections reconstructed within this <br />project. The project included numerous curb ramps <br />and driveway ramps. The Main Street Intersection <br />included a new traffic signal. <br />CENTER & WARREN <br />TOWNSHIP <br />RECONSTRUCTION | <br />INDIANAPOLIS <br />This project consisted of curb, sidewalk, and ramp <br />reconstruction at two locations within Center and <br />Warren Townships in Indianapolis. The design <br />and drawings of this project was completed within <br />an eight week period. The two locations included <br />nearly 5000 feet of reconstructed curb and sidewalk. <br />There were numerous driveway ramps and five <br />street intersections requiring updated access ramps <br />to current ADA standards. <br />WASHINGTON TOWNSHIP <br />RECONSTRUCTION | <br />INDIANAPOLIS <br />This project consisted of curb, sidewalk, and ramp <br />reconstruction at six locations within Washington <br />Townships in Indianapolis. The design and drawings <br />were completed within a ten week period. The six <br />locations included nearly 6000 feet of reconstructed <br />curb and sidewalk. There were numerous driveway <br />ramps and fifteen street intersections requiring <br />updated access ramps to current ADA standards.