Laserfiche WebLink
<br /> <br /> ENGINEERING • ARCHITECTURE • LAND SURVEYING <br />QUALIFICATIONS <br />6 <br />Abonmarche provided Construction Engineering services for the City of <br />La Porte for this $420,000 sidewalk project in a residential area within the <br />City of La Porte. The project included replacement of over 20 sidewalk <br />ramps and over 6,500’ of sidewalk and was constructed in the summer <br />of 2017. <br /> <br />The project was a success and provided safe ADA compliant <br />pedestrian routes for residents in the City of La Porte and added <br />numerous sidewalk ramps to assist those with wheel chairs and strollers. <br />We found the key to this project was communicating with the residents <br />prior to starting construction on their street and educating them about <br />the construction process. We assisted in finding routes in and out of houses when the sidewalks were removed <br />or fresh concrete was poured. It can be tricky to find a good route to a front door with on street parking in front <br />of homes. In order to save money for the City, our staff worked with the City, INDOT and the contractor to <br />determine what soils were adequate and didn’t required subgrade treatment. <br />LA PORTE, INDIANA <br />LA PORTE SIDEWALK REPLACEMENT PROJECT <br /> <br />This was an LPA multi-use trail project at <br />various locations within and near the <br />Town of Westville. The project <br />connected the existing HMA Lincoln <br />Memorial Trail to State Road 421, while <br />installing ADA compliant ramps at road <br />crossings. In conjunction to the trail, the <br />project also installed ADA compliant <br />ramps and concrete sidewalk with the <br />Town of Westville providing a Safe Route to School for the neighborhood. This project involved multiple <br />municipalities, INDOT, La Porte County, La Porte County Parks, and the Town of Westville. Throughout <br />construction our inspection team worked with the county planner, INDOT Area Engineer and contractor to <br />provide a cost savings at the end of the contract. <br />LINCOLN TRAIL AND SIDEWALKS <br />WESTVILLE, INDIANA <br />Abonmarche assisted the City of <br />Mishawaka in upgrading the Borley- <br />Lynn-Maplehurst Neighborhood that <br />was annexed to the City in the 1970’s <br />and infilling the vacant lots with new <br />affordable houses under the First Time <br />Home Buyer Program through HUD <br />Grants. Initially hired to do a study of <br />needed right of way improvements <br />City water service and sanitary sewer <br />were provided along Lynn Street and Maplehurst Avenue but Borley Avenue lacked both water service and <br />sanitary sewer because of the many undeveloped lots that fronted it. There were no sidewalks, curbing or storm <br />sewers within the neighborhood. The study was the financial planning tool the City needed to construct the <br />infrastructure improvements phased over a period of four years. Borley Avenue was the first street to be <br />completely reconstructed in two phases with new sanitary sewer, water main, storm sewer, concrete curbing, <br />asphalt pavement and sidewalk to accommodate the new homes to be constructed as part of the HUD <br />Program. Maplehurst Avenue and Lynn Street followed each in its own phase. <br />BORLEY, LYNN, AND MAPLEHURST <br />MISHAWAK, INDIANA