Laserfiche WebLink
<br /> <br /> ENGINEERING • ARCHITECTURE • LAND SURVEYING <br />Environmental Document <br /> <br />The project will most likely only require a Categorical Exclusion environmental document. A cursory review of <br />Indiana MAP did not identify significant areas of concern for this project. No wetlands, Section 4(f), Section 6 <br />(f), historical structures or sites were identified in a brief review of the project area. An Archaeological Phase 1 <br />report and Historic Properties Report will be prepared as part of the Section 106 process to verify that no <br />historic structures or sites are present. The project does not appear to pose significant environmental <br />obstacles. <br /> <br />Public Information Meeting <br />Our team will assist the City with a public information meeting to present the project and schedule to area <br />residents, schools, businesses, and other interested parties. A public hearing is not anticipated for this project, <br />but Abonmarche will assist the City in conducting any public hearings that may be appropriate. We will also <br />communicate and work with Muessel Primary and Holy Cross School on the project schedule and timing. <br /> <br />Maintenance of Traffic and Phasing <br /> <br />Maintenance of Traffic, pedestrian and vehicular, often has a significant impact on the public’s perception of <br />the success of a project during construction. Abonmarche will draft a maintenance of Traffic plan to ensure a <br />safe project. For this type of project, only relatively short pedestrian detours are acceptable and the detour <br />route must meet ADA accessibility standards. <br /> <br />Cost Saving Alternative <br /> <br />As part of our recommended approach, we will assist the City to see if INDOT-LPA Design Certification is <br />applicable for this type of project. Design Certification provides municipalities with more decision -making <br />authority and control over managing project design elements. This allows the project design to meet the <br />actual engineering needs of the project. This in-turn saves costs and allows more improvements to be <br />constructed within the allotted budget. Abonmarche will assist the City in their overall trail sidewalk plans by <br />determining the best use the grant dollars in conjunction with other funding methods to maximize the South <br />Bend dollars going to construction. <br />TECHNICAL APPROACH <br />10