My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Safe Routes to School - Muessel Primary and Holy Cross Area Proj No. 122-006 - Abonmarche
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Safe Routes to School - Muessel Primary and Holy Cross Area Proj No. 122-006 - Abonmarche
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 4:19:55 PM
Creation date
2/22/2022 4:19:44 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> ENGINEERING • ARCHITECTURE • LAND SURVEYING <br />Environmental Document <br /> <br />The project will most likely only require a Categorical Exclusion environmental document. A cursory review of <br />Indiana MAP did not identify significant areas of concern for this project. No wetlands, Section 4(f), Section 6 <br />(f), historical structures or sites were identified in a brief review of the project area. An Archaeological Phase 1 <br />report and Historic Properties Report will be prepared as part of the Section 106 process to verify that no <br />historic structures or sites are present. The project does not appear to pose significant environmental <br />obstacles. <br /> <br />Public Information Meeting <br />Our team will assist the City with a public information meeting to present the project and schedule to area <br />residents, schools, businesses, and other interested parties. A public hearing is not anticipated for this project, <br />but Abonmarche will assist the City in conducting any public hearings that may be appropriate. We will also <br />communicate and work with Muessel Primary and Holy Cross School on the project schedule and timing. <br /> <br />Maintenance of Traffic and Phasing <br /> <br />Maintenance of Traffic, pedestrian and vehicular, often has a significant impact on the public’s perception of <br />the success of a project during construction. Abonmarche will draft a maintenance of Traffic plan to ensure a <br />safe project. For this type of project, only relatively short pedestrian detours are acceptable and the detour <br />route must meet ADA accessibility standards. <br /> <br />Cost Saving Alternative <br /> <br />As part of our recommended approach, we will assist the City to see if INDOT-LPA Design Certification is <br />applicable for this type of project. Design Certification provides municipalities with more decision -making <br />authority and control over managing project design elements. This allows the project design to meet the <br />actual engineering needs of the project. This in-turn saves costs and allows more improvements to be <br />constructed within the allotted budget. Abonmarche will assist the City in their overall trail sidewalk plans by <br />determining the best use the grant dollars in conjunction with other funding methods to maximize the South <br />Bend dollars going to construction. <br />TECHNICAL APPROACH <br />10
The URL can be used to link to this page
Your browser does not support the video tag.