My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rejection of Quote - Studebaker Fountain Water Improvements Proj No. 121-032 - Culligan Water
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Reject Bids/Quotes/Proposals
>
Rejection of Quote - Studebaker Fountain Water Improvements Proj No. 121-032 - Culligan Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:40:25 AM
Creation date
2/10/2022 9:39:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 08/25/2021 Page - 26 Public Works Quote <br />XXXI. MISC ELECTRICAL AT EXISTING PUMP HOUSE <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Section 807. <br />B. Additions: <br /> <br />1. The Contractor shall be responsible for all electrical work including piping, wiring, circuits, GFCI <br />receptalces, electrical boxes, and all related appurtenances to extend electrical service from the <br />existing electrical panel located on the north side of the pump house (exterior panel) to the inside <br />of the building at the location of the Water Softener and Phosphate Injection system control panels. <br />2. All conduit, boxes and fittings shall be galvanized metal, <br />3. In use covers shall be installed on all boxes, receptacles, switches, etc. <br />4. Any junction boxes shall meet NEMA 3R ratings. <br />5. Contractor shall core through existing building wall as required to run new electrical wiring. <br />6. All components and installation shall meet or exceed NEMA 3R requirement. <br /> <br />7. Measurement and Payment <br /> <br />a. Payment for all costs of the Misc. Electrical work to extend electrical service , including the cost <br />of all materials, equipment, tools, labor, transportation, operations, and all other incidentals, <br />shall be paid for on a Lump Sum basis under the pay item: <br /> <br />MISC. ELECTRICAL……………………………………………………………………………..LFT <br />I. MULCHED SEEDING AND TOPSOIL <br />A. Prevailing Specifications: INDOT 2022 Standard Specifications Section 621 <br />B. Additions: <br />1. All seeded areas shall receive a minimum of 4” of approved topsoil prior to seeding operations. <br />a. A PH test is required to be run before topsoil is brought on site. <br />2. Debris 1” or larger shall be removed from the topsoil prior to seeding operations. <br />3. Sow seeds with drill seeding machine. Evenly distribute seed by sowing equal quantities at right <br />angles to each other. <br />4. Do not use wet seed or seed that is moldy or otherwise damaged. <br />5. After completion of drill seeding operations the Contractor shall hydromulch the entire seeded area. <br />6. Do not seed against existing trees. Limit extent of seed to outside edge of planting saucer. <br />7. Sow seed at total rate of 4 pounds/1000 square feet. <br /> <br />Seed Type % by Weight % by Purity % by <br />Germination <br />Kentucky Blue <br />Grass <br />36 85 80 <br />Red Fescue 30 98 85
The URL can be used to link to this page
Your browser does not support the video tag.