My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Title Sheet - Four Winds Casino Resort Sewer Extension Proj No. DP 19-81
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Title Sheets
>
Title Sheet - Four Winds Casino Resort Sewer Extension Proj No. DP 19-81
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 1:25:05 PM
Creation date
1/25/2022 1:24:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 7 <br /> <br />desirable to better align with the City’s long -range planning and to bring <br />service to a larger number of customers expected to reside southwest of the <br />Site. <br />F. WHEREAS changes to the Full Build -Out Phase water system <br />proposed by the City will significantly increase the scope and cost of the work <br />described in the Water/Sewer Agreement and, as a result, the City proposes to <br />assume the sole responsibility for the design and construction of the Full Build - <br />Out Phase for the water system in exchange for a financial contribution from <br />the Band Parties in the amount of $500,000, which amount represents the <br />Band Parties’ equitable share of the increased cost for the design and <br />construction of the modified Full Build -Out Phase water system; <br />NOW, THEREFORE, in consideration of the obligations, terms and <br />conditions contained herein, the adequacy of which the parties expressly <br />acknowledge, the Band, PGA, and the City agree as follows: <br />1. Recitals true. The above recitals are true. <br />2. Amendments. <br />A. Exhibit A, Exhibit C -1, Exhibit C-2, and Exhibit C -3 to the Water/Sewer <br />Agreement are deleted and are replaced by Exhibit A, Exhibit C -1, <br />Exhibit C-2, and Exhibit C -3 attached hereto. <br />B. As contemplated in Paragraph 4(b)(1) of the Water/Sewer Agreement, <br />the Band Parties and the City agree that the design and construction <br />of the Full-Build-Out Phase water system and sewer system shall <br />commence prior to the date the Full Build-Out Threshold is met. The <br />Band Parties and the City further agree to work diligently and <br />cooperatively in good faith to complete the design and construction <br />work of the Full Build -Out Phase to ensure that it is fully operational <br />not later than the date of completion of the Phase II Development of the <br />Site. <br />C. Subparagraph 4(b)(1)(A) is amended in its entirety to state as follows: <br />(A). To complete the loop of the watermain that is located off the <br />Site; and. <br />D. Paragraph 5(b) is amended by deleting in its entirety the first sentence <br />and replacing it with the following new sentence: “Provide to the City <br />all design plans for the Initial Phase improvements to the water system
The URL can be used to link to this page
Your browser does not support the video tag.