My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Title Sheet - Four Winds Casino Resort Sewer Extension Proj No. DP 19-81
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Title Sheets
>
Title Sheet - Four Winds Casino Resort Sewer Extension Proj No. DP 19-81
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 1:25:05 PM
Creation date
1/25/2022 1:24:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Calvert St <br />RENEWABLE RDCALVERT RD. <br />SR2 <br />3/ <br />P <br />R <br />AI <br />RI <br />E <br />A <br />V <br />E. <br />U <br />S <br /> <br />2 <br />0 <br />/ <br />3 <br />1 <br />LOCUST RD.WATER SERVICE AND <br />SEWER AGREEMENT <br />EXHIBIT A <br />DESCRIPTION OF LAYOUTS <br />ACCORDING TO FULL <br />BUILD-OUT <br />36" SS36" SSCALVERT RD. <br />LIFT STATION <br />SITE LIFT STATION <br />TO BE ABANDONED <br />AFTER CONNECTION <br />TO CALVERT ROAD <br />LIFT STATION <br />8" SS <br />12" W <br />8 <br />" <br /> W <br />24" <br />S <br />S <br />12" <br />W <br />12" W <br />12 <br />" <br /> <br />W <br />8" <br />S <br />S <br />SEE EXHIBIT C2 FOR <br />DELINEATION OF <br />PUBLIC AND PRIVATE <br />SYSTEM LIMITS 8" W8" SS8" SS <br />12" W <br />6" FM <br />6" FM <br />N <br />END OF FULL <br />BUILDOUT PHASE <br />8" SS8" WLEGEND <br />PUBLIC <br />SANITARY <br />SEWER <br />PUBLIC <br />WATER <br />MAIN <br />8" SS <br />12" W <br />PRIVATE <br />SANITARY <br />SEWER <br />PRIVATE <br />WATER <br />MAIN <br />8" SS <br />12" W <br />24" SS <br />ICE TRL.MAGNOLIA RD.WABASH ST.PROSPECT ST.MEADE ST.FAIRVIEW RD. <br />VICTORIA ST.SR23/PRAIRIE AVE.U <br />S <br /> <br />2 <br />0 <br />/ <br />3 <br />1 <br />END OF FULL <br />BUILDOUT PHASE <br />MYRTLE RD.SITE <br />BOUNDARY <br />WATER MAIN <br />SOUTHWEST <br />OF THIS POINT <br />TO BE DESIGNED <br />AND INSTALLED <br />BY THE CITY OF <br />SOUTH BEND
The URL can be used to link to this page
Your browser does not support the video tag.