Laserfiche WebLink
PROJECT NAME: <br />PROJECT NO. <br />FOR BIDS DUE: <br />CONTRACTOR NAME: <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />2021 Community Crossings Round 2 <br />121-052 <br />January 25, 2022, 9:00am, Local Time <br />Milestone Contractors North, Inc. <br />Division 9: Phillipa St from Hillside Ave to Indiana Ave <br />ox <br />1'e <br />res <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />5,039.50 <br />5,039.50 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />2,300.00 <br />2,300.00 <br />3 <br />Milling, up to 3" <br />5101 <br />5Y <br />3.50 <br />17,853.50 <br />4 <br />HMA Surface, 9.5 mm — Type B <br />421 <br />TONS <br />79.00 <br />33,259.00 <br />5 <br />HMA Intermediate, 12.5 mm - Type B <br />421 <br />TONS <br />70.00 <br />29,470.00 <br />6 <br />HMA for Patching <br />5 <br />TONS <br />480.00 <br />2,400.00 <br />7 <br />Tack Coat <br />1 <br />TONS <br />1,900.00 <br />1,900.00 <br />8 <br />Joint Adhesive, Surface <br />2604 <br />LF <br />2.00 <br />5,208.00 <br />9 <br />Adjust Manhole to Grade <br />5 <br />EA <br />1,650.00 <br />8,250.00 <br />10 <br />Adjust Water Valve Structure to Grade <br />4 <br />EA <br />130.00 <br />520.00 <br />11 <br />Adjust Inlet to Grade <br />10 <br />EA <br />800.00 <br />8,000.00 <br />12 <br />Concrete Curb Ramp, Removal <br />62 <br />SY <br />110.00 <br />6,820.00 <br />13 <br />Concrete Curb Ramp, Installation <br />62 <br />SY <br />240.00 <br />14,880.00 <br />DIVISION 9 TOTAL: $135,900.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 15 <br />