Laserfiche WebLink
PROJECT NAME: <br />PROJECT NO. <br />FOR BIDS DUE: <br />CONTRACTOR NAME: <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Vk- <br />2021 Community Crossings Round 2 <br />121-052 <br />January 25, 2022, 9:00am, Local Time <br />Milestone Contractors North, Inc. <br />Division 1: Kemble Ave from Bruce to Ewing <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />5,100.00 <br />5,100.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />10,470.33 <br />10,470.33 <br />3 <br />Milling, up to 3" <br />6641 <br />SY <br />2.80 <br />18,594.80 <br />4 <br />HMA Surface, 9.5 mm —Type B <br />559 <br />TONS <br />77.00 <br />43,043.00 <br />5 <br />HMA Intermediate, 12.5 mm - Type B <br />461 <br />TONS <br />68.00 <br />31,348.00 <br />6 <br />HMA for Patching <br />12 <br />TONS <br />260.00 <br />3,120.00 <br />7 <br />Tack Coat <br />2 <br />TONS <br />1,300.00 <br />2,600.00 <br />8 <br />Joint Adhesive, Surface <br />1843 <br />LF <br />3.00 <br />5,529.00 <br />9 <br />Adjust Manhole to Grade <br />3 <br />EA <br />1,650.00 <br />4,950.00 <br />10 <br />Adjust Water Valve Structure to Grade <br />2 <br />EA <br />130.00 <br />260.00 <br />11 <br />Adjust Inlet to Grade <br />6 <br />EA <br />800.00 <br />4,800.00 <br />12 <br />Line, Thermoplastic, Solid, White, 6" <br />74 <br />LF <br />1.88 <br />139.12 <br />13 <br />Line, Thermoplastic, Solid, Yellow, 4" <br />2800 <br />LF <br />0.58 <br />1,624.00 <br />14 <br />High Contrast Chevron, Multi - <br />Component <br />6 <br />EA <br />935.00 <br />5,610.00 <br />15 <br />Grooving for Pavement Markings, 4" <br />2800 <br />LF <br />0.54 <br />1,512.00 <br />16 <br />Transverse Marking, Thermoplastic, <br />Solid, White, 24" <br />17 <br />LF <br />11.75 <br />199.75 <br />17 <br />Concrete Curb Ramp, Removal <br />80 <br />SY <br />160.00 <br />12,800.00 <br />18 <br />Concrete Curb Ramp, Installation <br />80 <br />SY <br />300.00 <br />24,000.00 <br />19 <br />Concrete Speed Hump <br />3 <br />EA <br />21,100.00 <br />63,300.00 <br />20 <br />Tree Removal <br />1 <br />EA <br />3,500.00 <br />3,500.00 <br />DIVISION 1 TOTAL: $242,500.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />