My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No 35-2021 - Ameresco Inc. Qualified Provider Approval Guaranteed Energy Savings Contract Morris
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Resolutions
>
Resolution No 35-2021 - Ameresco Inc. Qualified Provider Approval Guaranteed Energy Savings Contract Morris
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 4:05:53 PM
Creation date
1/24/2022 4:05:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Confidential & Proprietary Information of Ameresco, Inc. <br />Page 48 of 54 <br />OPERATING COST SAVINGS <br />Operating Cost Savings includes avoided related capital expenditures for equipment replacement <br />and/or capital funds for projects that, because of the Scope of Services of this project, will not be <br />necessary. Sources of Operating Cost savings may include: i) avoided current or planned capital <br />expense, ii) avoided O&M and/or equipment repair and replacement expense, and, iii) avoided <br />renovation, renewal, or repair costs as a result of the project. <br />Deferring the related capital expenditure Scope of Services items included in this Agreement will result <br />in increased costs in the future when implemented. Ameresco uses RS Means construction data, as <br />well as recent project cost information (including data from bids for work to be performed), to <br />determine approximate replacement values for the various building systems impacted by this Project. <br />The current costs are then modified for performing this work in the future utilizing inflation, cost of <br />money, economies of scale, and other factors as applicable. The increased future costs are then <br />annualized, based on a project term, to determine the Year 1 Operating Cost Savings value. <br />From the Scope of Services related to the installation of the ECMs, the Customer will have a Year 1 <br />Operating Cost Savings (related capital expenditures) of $199,866 <br />Table G6: Year 1 Operating Costs Savings <br />Year Related Capital <br />Expenditures Savings <br />1 $199,866 <br />The Customer has identified the need for improving its existing facilities in order to address known <br />building deficiencies, extend the building / systems useful life, and address occupant comfort issues. <br />As a result, the Customer has developed estimates for the costs of the Scope of Services included in <br />the ECMs if a separate project had to be performed to complete such Scope. The Customer desires <br />to incorporate the Scope of Services into this Agreement in order to ensure such Scope is completed <br />within the schedule and cost agreed to with Ameresco. The Customer finds that the Year 1 <br />Operating Cost Savings identified in Table G6 are reasonable estimates of the costs avoided by <br />incorporating the Scope of Services into the Agreement and agrees and accepts these Year 1 <br />Operating Cost Savings subject to completion of the M&V Services set forth in this Attachment G. <br />In each subsequent Guarantee Year, the Year 1 Operating Cost Savings determined for the First <br />Guarantee Year shall be escalated at a rate of 3.0% per year to determine the total Operating Cost <br />Savings.
The URL can be used to link to this page
Your browser does not support the video tag.