Laserfiche WebLink
Page 4. <br /> cigarette taxes are down throughout the State . Ideally CCIF funds should be <br /> used to match LRSF Funds , but today the majority goes for hydrant rental and <br /> bond and rent payments. <br /> Councilman Voorde requested the funding sources and was informed that <br /> $219 , 000 comes from CD, $481 , 000 comes from LRS , and $750, 000 is the budgeted <br /> amount . Alley supplies would be addressed separately. <br /> Councilman Beck noted that the 1981 bond issue did not have alley <br /> machines . Mr. Watt put in an urgent request for two slurry machines but <br /> there would be no hard surface alley program addressed in the 1985 budget , <br /> only a grading program. Councilman Braboy stated that somehow the City must <br /> address a hard-surface program for alleys in the 1985 budget. She requested <br /> a special meeting of the Public Works Committee to address an alley improvement <br /> program. Mr. Watt noted that a 1 and 1/2" overlay could cost approximately <br /> $2 , 000 per block when you consider manpower and material. Reconstruction <br /> at a 4" rate would cost between $4 ,500 to $7 , 000 per block for labor , equipment , <br /> and material. Mr. Watt noted that realistically he does not have the manpower <br /> to address all of the alleys in a 3 year period. He noted that he has given <br /> much alley information to Craig Hartzer and John Leszczynski . He added that <br /> an alley inventory needs to be completed . He also added that the City appears <br /> "dirty" because of the airborne dust and that we must look into EPA standards <br /> for not only alleys but also unimproved parking lots . <br /> BUREAU OF VEHICLE MAINTENANCE pages 44-45 <br /> The 1985 budget was proposed at $674 ,415 which would be a 14% <br /> increase over the current budget of $590,063 . The Controller has reduced the <br /> requested amount to $634 , 006 which would be a 7% increase . <br /> Mr . Phil St . Clair and Mr. Sean Watt reviewed the budget requests. <br /> There would he two additional personnel added for next year. One would be a <br /> Stock Clerk T for $11 ,035 who would maintain records and pickup parts . The <br /> other new position would be a Mechanic IV which would bring the mechanics to <br /> 11 in number , The mechanics work a three shift operation in order to get all <br /> street department vehicles out year round . This has eliminated alot of down <br /> time . Overhauls and rebuilding takes place on the third shift . They are <br /> presently desiring to rebuild a wrecker. The mechanics work four ten hour. <br /> days. <br /> Mr. Watt noted that between 10 - 11 vehicles are rebuilt each year <br /> and he believes the program is a professional maintenance one . Oftentimes, <br /> the City must hire out on a contractual basis because the City does not have <br /> the right equipment for proper repairs.. Councilman Braboy noted that the <br /> City's hourly rate is $3-4. 00 lower than the private sector . Mr. St . Clair <br /> stated he would like a City--wide maintenance program which would not necessarily <br /> have to maintained in the same building. <br />