Laserfiche WebLink
1 HMA Type B, Surface 66 Tons $85.00 $5,610.00 $65.00 $4,290.00 $168.00 $11,088.00 $185.66 $12,253.56 <br />2 HMA Type B, Intermediate 110 Tons $75.00 $8,250.00 $55.00 $6,050.00 $105.00 $11,550.00 $116.04 $12,764.40 <br />3 HMA Type B, Base 312 Tons $70.00 $21,840.00 $50.00 $15,600.00 $84.00 $26,208.00 $128.96 $40,235.52 <br />4 Asphalt Tack Coat 1590 Sys $6.00 $9,540.00 $0.01 $15.90 $0.11 $174.90 $0.12 $190.80 <br />5 Compacted Aggregate, No. 53 402 Tons $30.00 $12,060.00 $29.00 $11,658.00 $49.50 $19,899.00 $56.05 $22,532.10 <br />6 Special Backfill, No. B-Borrow 125 Cys $18.00 $2,250.00 $153.00 $19,125.00 $42.00 $5,250.00 $23.21 $2,901.25 <br />7 Water Main 12 D.I. Pipe 1300 Lft $170.00 $221,000.00 $100.00 $130,000.00 $156.50 $203,450.00 $89.92 $116,896.00 <br />8 12" D.I. 22.5 Degree Bend, Restrained Joint 3 Ea.$1,200.00 $3,600.00 $1,525.00 $4,575.00 $970.00 $2,910.00 $1,581.44 $4,744.32 <br />9 16"X16"X12" Tapping Sleeve & Valve 1 Ea.$7,500.00 $7,500.00 $12,500.00 $12,500.00 $11,400.00 $11,400.00 $6,559.01 $6,559.01 <br />10 12" Gate Valve & Valve Box 1 Ea.$3,900.00 $3,900.00 $4,500.00 $4,500.00 $5,700.00 $5,700.00 $2,996.23 $2,996.23 <br />11 12", Plug 1 Ea.$700.00 $700.00 $600.00 $600.00 $1,100.00 $1,100.00 $375.35 $375.35 <br />12 Fire Hydrant Assembly 3 Ea.$5,500.00 $16,500.00 $7,500.00 $22,500.00 $6,500.00 $19,500.00 $5,312.52 $15,937.56 <br />13 Mulched Seeding, Type R 3,278 Sys $2.00 $6,556.00 $13.00 $42,614.00 $4.70 $15,406.60 $4.95 $16,226.10 <br />14 Temporary Silt Fence 1,185 Lft $2.50 $2,962.50 $2.40 $2,844.00 $4.50 $5,332.50 $3.08 $3,649.80 <br />15 Filter Sock 15 Lft $5.50 $82.50 $21.00 $315.00 $23.00 $345.00 $23.06 $345.90 <br />16 Construction Engineering 1 LS $3,000.00 $3,000.00 $10,500.00 $10,500.00 $17,600.00 $17,600.00 $7,575.07 $7,575.07 <br />17 Pothole for Utilities 2 Ea.$2,500.00 $5,000.00 $10,000.00 $20,000.00 $9,600.00 $19,200.00 $1,450.44 $2,900.88 <br />18 Mobilization and Demobilization 1 LS $6,000.00 $6,000.00 $128,813.10 $128,813.10 $16,700.00 $16,700.00 $44,112.55 $44,112.55 <br />Certified 11/10/2021 <br /> Nitin V. Timble PE, LS Date <br />Engineer's Estimate HRP Construction Inc.Indiana Earth, Inc.G.E. Marshall, Inc. <br />DESCRIPTION OF ITEM UNIT Extension Extension <br />$336,351.00 <br />Airport Annexation Area Water Main Extension/ SB # 120-026 <br />Bid Tab <br />Unit Price Unit PriceITEM <br />TOTAL BID (Items 1 to 18)$313,196.40$392,814.00$436,500.00 <br />Unit PriceESTIMATED <br />QUANTITY <br />Unit Price Extension Extension