My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Wastewater Discharge Permit - Tri-Pac, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Licenses & Permits
>
Industrial Wastewater Discharge Permit - Tri-Pac, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:34:06 AM
Creation date
12/15/2021 8:33:54 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Requests
Document Date
12/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tri-Pac Inc. Industrial Wastewater Discharge Permit page 2 of 36 <br /> <br />FYI… Tri-Pac Inc.’s permit includes the following requirements found within the discharge permit: <br /> <br />• Tri-Pac Inc. (Tri-Pac) shall, within 90 days of the effective date of this discharge permit, submit a Slug Control Plan and a <br />Flow Measurement Plan with the certification statement signed by an Authorized Representative. Please see Part III (E) and <br />(H). <br />• Tri-Pac Inc’s Authorized Representative shall sign with the certification statement (found in Part III (A) (4)) all reports <br />including but not limited to Periodic Compliance Reports (PCR), Slug Control Plans, Flow Measurement Plans, corrective <br />actions in response to permit violations, and any correspondence relating to compliance with this industrial discharge permit. <br />• If Tri-Pac Inc wishes to change the Authorized Representative responsible to receive correspondence from the City, a written <br />designation must be submitted to the City indicating 1) the name of the new Authrorized Representative designated to receive <br />compliance correspondence, 2) their position in the company, 3) a statement that they meet the requirements in Part IV <br />(B)(15) of this permit, 4) complete contact information and 5) an effective date of this diesignation. Please review Part III <br />(I)(3) and Part IV(B)(15) for more details and specific criteria. <br />• Any sample collected in accordance with this permit must be reported with the PCR. <br />• When collecting composite samples, samples must be obtained over a 24 hour period or for the duration of discharge within <br />the 24 hour sampling period including, if applicable, multiple batches. <br />• Within 30 days of the effective date of this permit, Tri-Pac Inc shall commence to notify the City of South Bend via e-mail <br />twenty-four (24) hours in advance of all batch or infrequent discharges to the City’s sewer so that during this time compliance <br />monitoring may be conducted. Please see Part III (C) for more details. <br />• Samples shall be obtained through a flow-proportional sampling technique. If Tri-Pac Inc can demonstrate that time- <br />proportional sampling is as representative as flow-proportional sampling, then a time-proportional sample may be collected. <br />If Tri-Pac Inc chooses to demonstrate that time-proportional sampling is accurate they must do so within 120 days of the <br />effective date of this permit or they shall commence flow-proportional sampling at that time. Please see Part II (B) (1) of <br />your wastewater discharge permit for details. <br />• To be submitted with the PCR, the Certified Operator shall sign one of the following statements: “Pretreatment Standards <br />and Requirements are being met on a consistent basis” or “Pretreatment Standards and Requirements are not being met on a <br />consistent basis. Additional operation and/or additional pretreatment is required to meet the Pretreatment Standards and <br />Requirements”. Please see Part III (A) (3) (a) and and Part III (F) (1). <br />• Transfer of Ownership: If permittee plans to change ownership or transfer of this wastewater discharge permit, permittee <br />shall give the Control Authority at least 30 days notice with written certification by the new owner or operator. See Part IV <br />(B)(11) of permit for more details. <br />• Tri-Pac Inc shall verbally notify the City immediately of discharges that may cause problems to the POTW, including any <br />slugload or accidental discharge, followed by a written verification within five (5) days of the incident. See Part III (E) (2) <br />• If sampling performed by Tri-Pac Inc indicates a violation, Tri-Pac Inc. shall notify the City orally within 24 hours of <br />becoming aware of the violation, submit a written follow up report within five days, and resample and submit the results of <br />the analysis to the Control Authority within thirty (30) days after becoming aware of the violation. See Part III (D) of permit <br />for more details on permit violations. <br />• Tri-Pac Inc shall notify the Control Authority of any significant changes to the permittee’s operations or system which might <br />alter the nature, quality, or volume of its wastewater at least thirty (30) days before the change. See Part III (G) <br />• In the event that an oral notification is required due to a spill or slug to the sewer, or other emergency, the permittee shall <br />immediately call 574-277-8515 and dial zero (0) to reach an operator. See Part III (I) of your permit for details. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.