My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Wastewater Discharge Permit - Tri-Pac, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Licenses & Permits
>
Industrial Wastewater Discharge Permit - Tri-Pac, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:34:06 AM
Creation date
12/15/2021 8:33:54 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Requests
Document Date
12/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tri-Pac Inc. Industrial Wastewater Discharge Permit page 14 of 36 <br />e. The plan shall also include the certification statement found in Part III (A) (4) signed by <br />the Authorized Representative [see Part IV (B) (15)] <br /> <br />2. The permittee shall orally notify the Control Authority immediately upon the occurrence of a slug or <br />accidental discharge of prohibited substances. The notification shall include location of discharge, date <br />and time of occurrence, type of waste, concentration and volume, and corrective action. Immediate <br />notification shall be verbal followed by a written verification within five (5) days of the incident. <br /> <br />3. The permittee shall notify the Control Authority immediately if any changes occur at the facility that <br />affect the potential for a slug or accidental discharge. Additionally, the permittee shall submit a revised <br />plan that reflects those changes. <br /> <br />4. Once submitted, the Accidental Discharge/Slug Control Plan shall be deemed an enforceable part of the <br />permit and shall be implemented as written. Any deviation from the Accidental Discharge/Slug Control <br />Plan shall constitute a permit violation. <br /> <br /> <br />F. Certified Operator Requirement: <br /> <br />1. As required by Section 17-10 (o)(4)(b) of the South Bend Municipal Code: <br /> <br />Tri-Pac Inc. <br />3701 Progress Drive <br />South Bend IN 46628 <br /> <br />Tri-Pac, Inc shall be required to have a Certified Industrial Wastewater Operator of the State of Indiana <br />with the minimum classification listed below, sign all periodic compliance reports, 90 day compliance <br />status reports, and all compliance schedule reports, indicating whether Pretreatment Standards are being <br />met on a consistent basis, and if not whether additional operation and maintenance and/or additional <br />pretreatment is required to meet the Pretreatment Standards and Requirements. <br /> <br />The Certified Operator shall sign one of the following statements: <br /> <br />“Pretreatment Standards and Requirements are being met on a consistent basis.” <br /> <br />Or <br /> <br />“Pretreatment Standards and Requirements are not being met on a consistent basis. Additional <br />operation and maintenance and/or additional pretreatment is required to meet the Pretreatment <br />Standards and Requirements.” <br /> <br />Industrial Certified Operator Classification: B <br /> <br />2. This permit holder shall have a certified operator, with the minimum classification listed above, sign all <br />periodic compliance reports, 90 day compliance status reports, and all compliance schedule reports. <br /> <br />3. If a certified operator is not signing permittee’s user reports, a $500.00 fine will be assessed followed by <br />a $500.00 fine for every user report submitted, until the certified operator requirement is met. <br /> <br />4. If laboratory analytical data was not reported on the PCR, the requirement for the PCR to be signed by a <br />Certified Industrial Wastewater Operator is not required, unless otherwise indicated by the Director.
The URL can be used to link to this page
Your browser does not support the video tag.