My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Eddy St. Ramps (Belmont) to Louise St., Mishawaka Ave. Streetscape Proj No. 1 – Lawson-Fisher Associates P.C.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Eddy St. Ramps (Belmont) to Louise St., Mishawaka Ave. Streetscape Proj No. 1 – Lawson-Fisher Associates P.C.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:22:18 AM
Creation date
12/15/2021 8:21:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 1 <br />Exhibit C – Appendix 2: Standard Hourly Rates Schedule <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />This is Appendix 2 to EXHIBIT C, consisting of 1 page, <br />referred to in and part of the Agreement between Owner <br />and Engineer for Professional Services dated December <br />14, 2021. <br /> <br />Standard Hourly Rates Schedule <br /> <br />A. Standard Hourly Rates: <br />1. Standard Hourly Rates are set forth in this Appendix 2 to this Exhibit C and include salaries <br />and wages paid to personnel in each billing class plus the cost of customary and statutory <br />benefits, general and administrative overhead, non-project operating costs, and operating <br />margin or profit. <br />2. The Standard Hourly Rates apply only as specified in Article C2. <br />B. Schedule: <br /> Hourly rates for services performed on or after the date of the Agreement are listed as provided <br />on the following schedule: <br /> <br /> Engineer V $ 275.00 /hour <br /> Engineer IV $ 210.00 /hour <br /> Engineer III $ 181.00 /hour <br /> Engineer II $ 144.00 /hour <br /> Engineer I $ 132.00 /hour <br /> Engineer Intern 2 $ 106.00 /hour <br /> Engineer Intern 1 $ 97.00 /hour <br /> Engineering Asst. $ 92.00 /hour <br /> Prof. Land Surveyor III $ 188.00 /hour <br /> Prof. Land Surveyor II $ 146.00 /hour <br /> Prof. Land Surveyor I $ 110.00 /hour <br /> Surveyor 2 $ 132.00 /hour <br /> Surveyor 1/ Technician 1 $ 78.00 /hour <br /> CAD Technician 4 $ 161.00 /hour <br /> CAD Technician 3 $ 114.00 /hour <br /> CAD Technician 2 $ 102.00 /hour <br /> Environmental Doc Spec. $ 91.00/hour <br /> Project Information II $ 137.00 /hour <br /> Project Information I $ 72.00 /hour <br /> Inspector 2 $ 151.00 /hour <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.