My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Eddy St. Ramps (Belmont) to Louise St., Mishawaka Ave. Streetscape Proj No. 1 – Lawson-Fisher Associates P.C.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Eddy St. Ramps (Belmont) to Louise St., Mishawaka Ave. Streetscape Proj No. 1 – Lawson-Fisher Associates P.C.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:22:18 AM
Creation date
12/15/2021 8:21:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 3 <br />Exhibit C –Basic Services (other than RPR and Post-Construction) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />6. If amounts billed under this compensation method are within ten percent (10%) of the <br />maximum amount payable prior to the satisfactory completion of the described services, the <br />Engineer shall notify Owner and the status will be evaluated. <br />7. The Standard Hourly Rates and Reimbursable Expenses Schedule will be adjusted annually <br />(as of January 1) to reflect equitable changes in the compensation payable to Engineer. <br />C2.04 Compensation for Reimbursable Expenses <br /> <br />A. Owner shall pay Engineer for all Reimbursable Expenses at the rates set forth in Appendix 1 to this <br />Exhibit C. <br />B. Reimbursable Expenses include the following categories: transportation and subsistence incidental <br />thereto; providing and maintaining field office facilities including furnishings and utilities; toll <br />telephone calls and mobile phone charges; reproduction of reports, Drawings, Specifications, <br />Bidding Documents, and similar Project-related items in addition to those required under Exhibit <br />A. In addition, if authorized in advance by Owner, Reimbursable Expenses will also include <br />expenses incurred for the use of highly specialized equipment. <br />C. The amounts payable to Engineer for Reimbursable Expenses will be the Project-related internal <br />expenses actually incurred or allocated by Engineer, plus all invoiced external Reimbursable <br />Expenses allocable to the Project, the latter multiplied by a factor of 1.05. <br />C2.05 Other Provisions Concerning Payment <br /> <br />A. Whenever Engineer is entitled to compensation for the charges of Engineer’s Consultants, those <br />charges shall be the amounts billed by Engineer’s Consultants to Engineer times a factor of 1.00. <br />B. Factors. The external Reimbursable Expenses and Engineer’s Consultants' factors include <br />Engineer’s overhead and profit associated with Engineer’s responsibility for the administration of <br />such services and costs. <br />C. Estimated Compensation Amounts: <br />1. Engineer’s estimate of the amounts that will become payable for specified services are only <br />estimates for planning purposes, are not binding on the parties, and are not the minimum or <br />maximum amounts payable to Engineer under the Agreement. <br />2. When estimated compensation amounts have been stated herein and it subsequently becomes <br />apparent to Engineer that the total compensation amount thus estimated will be exceeded, <br />Engineer shall give Owner written notice thereof, allowing Owner to consider its options, <br />including suspension or termination of Engineer's services for Owner's convenience. Upon <br />notice, Owner and Engineer promptly shall review the matter of services remaining to be <br />performed and compensation for such services. Owner shall either exercise its right to <br />suspend or terminate Engineer's services for Owner's convenience, agree to such <br />compensation exceeding said estimated amount, or agree to a reduction in the remaining <br />services to be rendered by Engineer, so that total compensation for such services will not <br />exceed said estimated amount when such services are completed. If Owner decides not to
The URL can be used to link to this page
Your browser does not support the video tag.