Laserfiche WebLink
<br />Page 16 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />a. Design Survey 15 days 12/31/21 <br />b. Project Concept 29 days 01/14/22 <br />c. Grade Review Plans 73 days 02/27/22 <br /> <br />Deliverable dates for subsequent design phases and work described in Part I – Basic Services will <br />be addressed in an agreement amendment after Grade Review Plans are submitted and reviewed <br />by the Owner. <br /> <br />C. All dates shown are based on a Notice to Proceed received not later than December 15, 2021. <br />Design Development dates are based on an anticipated construction that will be completed in 2023. <br /> <br />A3.02 Construction <br /> <br />A. Questions, clarifications or corrections requested by the Owner's construction personnel regarding <br />the interpretation of the Engineer's plans shall be addressed within a reasonable period of time <br />from the Engineer's receipt of the Owner request. <br /> <br />B. Modification to the plans during the construction phase due to unforeseen or unusual conditions <br />shall be made within a reasonable period of time following receipt by the Engineer of the Owner's <br />request and notice to proceed.