My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Eddy St. Ramps (Belmont) to Louise St., Mishawaka Ave. Streetscape Proj No. 1 – Lawson-Fisher Associates P.C.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Eddy St. Ramps (Belmont) to Louise St., Mishawaka Ave. Streetscape Proj No. 1 – Lawson-Fisher Associates P.C.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:22:18 AM
Creation date
12/15/2021 8:21:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 16 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />a. Design Survey 15 days 12/31/21 <br />b. Project Concept 29 days 01/14/22 <br />c. Grade Review Plans 73 days 02/27/22 <br /> <br />Deliverable dates for subsequent design phases and work described in Part I – Basic Services will <br />be addressed in an agreement amendment after Grade Review Plans are submitted and reviewed <br />by the Owner. <br /> <br />C. All dates shown are based on a Notice to Proceed received not later than December 15, 2021. <br />Design Development dates are based on an anticipated construction that will be completed in 2023. <br /> <br />A3.02 Construction <br /> <br />A. Questions, clarifications or corrections requested by the Owner's construction personnel regarding <br />the interpretation of the Engineer's plans shall be addressed within a reasonable period of time <br />from the Engineer's receipt of the Owner request. <br /> <br />B. Modification to the plans during the construction phase due to unforeseen or unusual conditions <br />shall be made within a reasonable period of time following receipt by the Engineer of the Owner's <br />request and notice to proceed.
The URL can be used to link to this page
Your browser does not support the video tag.