My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Eddy St. Ramps (Belmont) to Louise St., Mishawaka Ave. Streetscape Proj No. 1 – Lawson-Fisher Associates P.C.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Eddy St. Ramps (Belmont) to Louise St., Mishawaka Ave. Streetscape Proj No. 1 – Lawson-Fisher Associates P.C.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:22:18 AM
Creation date
12/15/2021 8:21:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 12 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />reasonable times during normal working hours to respond to reasonable inquiries concerning the <br />accuracy or intent of the Engineer's plans. All such inquiries shall be made only by persons <br />designated by the Owner to interpret the plans and Contract documents for the benefit of the <br />contractors and subcontractors performing the work. The Engineer shall not be required to respond <br />to inquiries by persons other than Owner's designated representative -- hereafter referred to as the <br />Construction Engineer -- and shall not be required to engage in exhaustive or extensive analysis <br />or interpretation of the plans. <br /> <br />B. The Engineer shall review all shop drawings as provided in the developed contract documents. <br />The Engineer shall make sure applicable requirements are met and all materials conform to the <br />special provisions that have been written for the project. <br /> <br />C. The Engineer shall review all shop drawings involving Mechanically Stabilized Earth retaining <br />walls, culvert structures, traffic control work, signing, lighting, signals or other items as outlined <br />in Chapter 14 of Indiana Department of Transportation Design Manual. <br /> <br />D. If during the construction phase it is determined that unforeseen or unusual conditions arise, the <br />Engineer shall revise the plans with the Owner's approval. <br /> <br />E. The Engineer shall provide Utility Coordination Services during the Construction Ph ase. The <br />Engineer shall act as a liaison between utility companies, Owner, and the Contractor. These <br />services may include answering questions, interpreting plans and coordinating activities. The <br />Engineer shall assist the Construction Engineer in resolving problems concerning utility facility <br />relocations during construction. The Engineer shall work with the utilities, contractor and the <br />Construction Engineer to resolve any conflicts that may arise during construction. The Engineer <br />shall attend utility coordination meetings held by the contractor. The Engineer shall also attend <br />project progress meetings held by the Construction Engineer as needed. <br /> <br />F. Duration of Construction Phase: The Construction Phase will commence with the execution of <br />the first Construction Contract for the Project or any part thereof and will terminate upon written <br />recommendation for final payment to Contractors. The Project involves more than one prime <br />contract and Construction Phase services may be rendered at different times in res pect to the <br />separate contracts. Subject to the provisions of Article 3, Engineer shall be entitled to an equitable <br />increase in compensation if Construction Phase services (including Resident Project <br />Representative Services, if any) are required after the original date for completion and readiness <br />for final payment of Contractor as set forth in the Construction Contract. <br /> <br />G. Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any <br />of the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />for the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br /> <br />PART 2 – ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner’s Written Authorization <br />
The URL can be used to link to this page
Your browser does not support the video tag.