My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Eddy St. Ramps (Belmont) to Louise St., Mishawaka Ave. Streetscape Proj No. 1 – Lawson-Fisher Associates P.C.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Eddy St. Ramps (Belmont) to Louise St., Mishawaka Ave. Streetscape Proj No. 1 – Lawson-Fisher Associates P.C.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:22:18 AM
Creation date
12/15/2021 8:21:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 3 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />C. The Engineer will participate in stakeholder meetings with select stakeholder as determined and <br />coordinated by city staff. An estimate of four (4) informal meetings are anticipated. <br />D. Coordinate, host and conduct a public information meeting for local officials, civic <br />organizations, and others to gage public sentiment and ensure proper coordination with local <br />populace. The meeting will present the proposed project in the developed conceptual drawing, <br />prepared presentation, and facilitate comments, questions, and answers from the attendees. <br /> <br /> <br />A1.04 Road Plan Development <br /> <br />A. Preliminary Plotting shall be performed by the Engineer using the digital working drawing(s) <br />completed as part of the Topographic Survey. This shall be completed in general conformance <br />with Indiana Department of Transportation and Owner standards at appropriate scale(s). The <br />Engineer shall complete the following items within these project limits and incorporate into the <br />prepared Road Plans: <br /> <br />1. Identify the survey centerline, property lines and existing property owners. <br /> <br />2. Develop existing survey centerline profile and cross section data. <br /> <br />3. Describe and identify in plan survey benchmarks. <br /> <br />4. Identify existing buildings, commercial signs, and other man made improvements within the <br />survey limits. <br /> <br />5. Describe existing features as topographic notes on the developed plan sheets. <br /> <br />6. Identify existing sewers and other below grade utilities based on field location(s) from plan <br />records and field markings provided by others. <br /> <br />7. Reconcile and identify the survey centerline and S-lines with witness boxes from witnessed <br />monuments from the topographic survey. <br /> <br />B. Preliminary Plan Development shall be extended by the Engineer from the completed <br />Preliminary Plotting phase. The Engineer shall complete the following items within these project <br />limits and incorporate into the prepared Road Plans: <br /> <br />1. Develop proposed line work <br /> <br />2. Preliminary drainage design <br /> <br />3. Develop project Title and Index Sheets <br /> <br />4. Prepare preliminary Typical Section Sheets <br /> <br />5. Develop preliminary Plan and Profile sheets <br /> <br />6. Prepare intersection and approach details
The URL can be used to link to this page
Your browser does not support the video tag.