My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Technical Assistance for 2022 DSSMR South Bend Dam Proj No. 122-019 – Christopher B. Burke Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Technical Assistance for 2022 DSSMR South Bend Dam Proj No. 122-019 – Christopher B. Burke Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:20:53 AM
Creation date
12/15/2021 8:20:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of December 14, 2021 (“Effective Date”) between <br />Board of Public Works, City of South Bend, Indiana ("Owner") and <br />Christopher B. Burke Engineering, LLC (“Engineer”). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />2022 South Bend Dam Technical Assistance (“Project"). <br />Engineer’s Services under this Agreement are generally identified as follows: <br />SEE ATTACHED ENGINEER’S SCOPE OF SERVICES – ATTACHMENT A <br />Owner and Engineer further agree as follows: <br />1.01 Basic Agreement and Period of Service <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services as set forth <br />in Paragraphs 7.01 and 7.02. <br />B. Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: <br />1.2021 DSSMR Report – April 1, 2022 <br />2.2022 Annual Inspection – December 31, 2022 <br />3.DSSMP Updates – April 1, 2022 <br />4.Gate Operation Certification – December 31, 2022 <br />5.Emergency Action Plan Exemption – December 31, 2022 <br />C. If the Project includes construction-related professional services, then Engineer's time for <br />completion of services is conditioned on the time for Owner and its contractors to complete
The URL can be used to link to this page
Your browser does not support the video tag.