Laserfiche WebLink
<br /> <br /> <br /> <br />Confidence in the built environment. <br /> <br />135 N. Pennsylvania Street, Suite 2800 <br />Indianapolis, IN 46204 <br /> <br />www.hwcengineering.com <br /> <br /> Indianapolis | Hammond | Lafayette | Muncie | New Albany | Terre Haute <br /> <br /> www.hwcengineering.com <br /> <br /> <br /> <br /> <br />November 18, 2021 <br /> <br /> <br /> <br />Ms. Sue Ellen Doudrick, P.E. <br />Assistant City Engineer <br />227 West Jefferson Blvd., Suite 1316 <br />South Bend, IN 46601 <br /> <br />Re: Prairie Avenue Water Main Loop <br /> Project No. 117-068 <br /> Bid Review <br /> <br />Dear Sue Ellen: <br /> <br />We have reviewed the bids received on November 9, 2021 for the Prairie Avenue Water Main Loop (Project <br />No. 117-068) and offer the following comments for your review and approval. <br /> <br />As shown on the attached certified bid tabulation, three (3) bids were received from the following contractors: <br />HRP Construction Inc. (HRP), Selge Construction Co., Inc. (Selge) and Woodruff & Sons, Incorporated. The <br />base bid amounts ranged from $1,699,481.01 to 2,117,158.48. The apparent low bidder on the base bid <br />was Selge with a base bid amount of $1,699,481.01. This bid is below the engineer’s estimate of <br />$1,802,090.00. <br /> <br />The project also included one mandatory alternate bid for the use of horizontal directional drilling for the water <br />main within SR-23 in lieu of the base bid method of open cut installation. The mandatory alternate bid is the <br />net difference from the base bid, and if accepted, it shall be combined with the base bid to determine the low <br />bidder on the project. The “as-read” mandatory alternate bid amounts from Selge, HRP, and Woodruff & <br />Sons were ($10,200.00), ($31,000.00), and ($172,950.18) respectively. An omission was noted on HRP’s <br />alternate bid for the unit price for Item 15 (Recycled Concrete for Pavement Sub-base, No. 53) which when <br />included reduced the as-read amount by ($11,500) for a total deduction for the mandatory alternate of <br />($42,500.00). If the mandatory alternate is accepted, HRP would be the low bidder based on the combination <br />of the base bid and the mandatory alternate. The omission on HRP’s alternate bid would not affect the <br />determination of the low bidder if the mandatory alternate is accepted, since either the “as-read” amount or <br />the corrected amount would still result in HRP being the low bidder. A summary table of the bid results is as <br />follows: <br /> <br /> <br />Bidder Base Bid Mand. Alt. Bid Combined <br />HRP "As-Read" $1,714,000.00 ($31,000.00) $1,683,000.00 <br />HRP Corrected $1,714,000.00 ($42,500.00) $1,671,500.00 <br />Selge $1,699,481.01 ($10,200.00) $1,689,281.01 <br />Woodruff & Sons $2,117,158.48 ($172,950.18) $1,944,208.30 <br />