Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Morris Performing Arts Center - Main Level Slab Replacement <br />Project Number: 121-029a <br />For Bids Due: December 14, 2021 <br />Contractor Name: The Robert Henry Corporation <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price Total Amount <br />1.1 <br />CPM Schedule <br />1 <br />LS <br />Q,6Q0- 0 a,CQ0 •d0 <br />2.1 <br />Preconstruction Video <br />1 <br />LS <br />(Q,3?0. (o,380•40 <br />3.1 <br />Utility Allowance <br />1 <br />LS <br />$10,000.00 $10,000.00 <br />4.1 <br />Protection of the Existing Structure <br />1 <br />LS <br />&,1.300.06 J . 310,33X-00 <br />5.1 <br />Construction Engineering <br />1 <br />LS <br />�) I I,�oQ,aD 11 j QeD. C6 <br />6.1 <br />Common Excavation <br />152 <br />CYS <br />*H,yBa <br />7.1 <br />Structure Backfill <br />38 <br />CYS <br />(.0(co-60 <br />Chair Removal <br />1 <br />LS <br />(�1,-7�rir00 (QI �•� <br />9.1 <br />Slab on Grade — Remove and Replace <br />530 <br />SYD <br />577 5 3140,Y/0.00 <br />10.1 <br />Air Duct Trench — Remove and Replace <br />340 <br />LFT <br />11.1 <br />Cable Trough <br />182 <br />LFT <br />o190•Cb $a� %�7. <br />12.1 <br />Return Air Grilles <br />109 <br />EA <br />&ly&7.4U J5 413 0)ZIM <br />13.1 <br />Electric — Remove and Replace <br />1 <br />LS <br />(GQ 1W•60 S Val I_ --b5.60 <br />14.1 <br />Architectural Features and Finishes <br />1 <br />LS <br />3g,ysa 5 (31p,Y5D• <br />15.1 <br />Elevated Seating Platforms <br />1 <br />LS <br />,�3 o`iGS 3 004 <br />i <br />16.1 <br />Mobilization & Demobilization (5% Max) <br />1 <br />LS <br />I ,d90. <br />Bidder (Firm): The Robert Henry Corporation <br />Address: 404 S. Frances St. <br />City/State/Zip: South Bend, IN 46617 Telephone Number: <br />By <br />BASE BID TOTAL ,3r%o�• 18�•� <br />574 ) 232-2091 <br />R� <br />Brian S. Henry, PresideA, t <br />(Printed Name of Person Signing) <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />