Laserfiche WebLink
Page 1 of 2 <br />ATTACHMENT D-1 <br /> <br />PROJECT FUNDS <br /> <br />I. Project Costs. <br /> <br />A. This contract is just for the one (1) phase checked below: <br /> <br /> <br /> <br />Preliminary Engineering or <br /> <br /> <br />Right-of-Way or <br /> <br /> <br />Construction; <br /> <br /> Otherwise, this contract covers all phases. <br /> <br />B. If the Program shown on Attachment A is receiving federal -aid funds for the project, the <br />LPA is allocated the funds through the MPO as written in their fiscally constrained TIP. <br />Any adjustments (positive or negative) to the dollar amount listed in the TIP , or any increase <br />or decrease in the funding from a prior year, authorized by the MPO that may not be <br />reflected in the current TIP, are hereby considered adjustments to the contract between the <br />LPA and INDOT, as the MPO must maintain fiscal constraint for all projects listed. Federal <br />funds made available to the LPA by INDOT will be used to pay 80% of the eligible Project <br />costs. The maximum amount of federal -aid funds allocated to the Project is dependent upon <br />the current TIP allocation. As of this date, October 22, 2021 , the maximum amount <br />according to the TIP dated February 3, 2016, is $3,450,192.00 . The most current MPO TIP <br />page, or MPO authorization, is uploaded into INDOT's Scheduling Project Management <br />System (SPMS). <br />OR <br /> <br /> Federal-aid Funds made available to the LPA by INDOT will be used to pay % of the <br />eligible Project costs. The maximum amount of federal funds allocated to the project is $ . <br /> <br /> C. The LPA unde rstands and agrees that it is INDOT's policy to only allow non -discretionary <br />changes to a Project scope after bidding. Changes to the Project scope after bidding that are <br />by the choice of the LPA and are not required to complete the Project will not be el igible for <br />federal-aid funds and must be funded 100% locally. <br /> <br /> D. The LPA understands and agrees that the federal-aid funds allocated to the Project are <br />intended to accomplish the original scope of the Project as designed. If the Project bid prices <br />are lower than estimated, the LPA may not utilize those federal-aid funds and the remaining <br />balance of federal-aid funds will revert back to the Local Program. <br /> <br /> E. If the Program shown on Attachment A is Group I or Group II, Section E. does not apply. <br />If the Project bid prices are lower than estimated, the LPA may not utili ze those federal-aid <br />funds and the remaining balance of federal-aid funds will revert back to the MPO. <br /> <br /> F. The remainder of the Project cost shall be borne by the LPA. For the avoidance of doubt, <br />INDOT shall not pay for any costs relating to the Project unless the PARTIES have agreed in <br />a document (which specifically references section I.D. of Attachment D of this contract) <br />signed by an authorized representative of INDOT, the Indiana Department of Administration, <br />State Budget Agency, and the Attorney Gen eral of Indiana. <br /> <br /> G. Costs will be eligible for FHWA participation provided that the costs: <br /> <br />DocuSign Envelope ID: ADA76824-B844-44A7-9E25-491DCCE492E3 <br />In Process