Laserfiche WebLink
4 - t-73 <br />t <br />ril <br />The Board net in regular session at 10 A. M. Mr.4Papezynski was absent. <br />The Engineer was instructed to prepare specifications for Brick pavement on South <br />Bend avenue from Hill street to the east line of Notre Dame street. <br />Bids were opened and referred to the Engineer for tabulation for the following <br />improvements; <br />Asphalt pavement on S. Main street; Asphalt pavement on William street;, <br />Asphalt pavement on E. Jefferson street; Brick Pavement on W. Washington street; <br />Brick Pavement on Leland avenue; Brick pavement on Cushing street, Pipe Sewer on Linden <br />avenue & Walnut street; Pipe Sewer on Linden avenue. <br />President. <br />