Laserfiche WebLink
3 <br />The Board met in regular session at 10-A. M. All members present. <br />Plat of George Rush's Sub -Division of Lot No 1 of Kuntsman's 211d Addition, <br />filed and approved.. <br />Contract awarded to Studebaker ,&;Chard for "Round Oak" furnace for No. 3 <br />Hose House -Contract price $237.00 <br />. Petition filed for Pipe Sewer on Cedar Street from Hill street to Eddy street. <br />Petition was amended so as to read to Emerick street instead of Eddy street. Referred <br />to the Engineer for specifications. <br />Hearing on Condemnation Resolution No. 22, the opening of an alley South of <br />the Cemetery from Elm street west, was deferred until Mar 20th2 1906, at 10 A. M. <br />Hearing given on Vacation Resolution No. 41, vacating the following described <br />property, to -wit: <br />An alley seven (7) feet wide along the Vest side of lots . 10 & 11 in <br />Studebakers Sub -Division of B. 0. L. 3 and 0. L. North of same. <br />In the above matter no remonstrators appeared and no remonstrances were filed. <br />The Board therefore declare the above described property in all things vacated. <br />President. <br />