Laserfiche WebLink
299 <br />Tuesday September 26th, 1905. <br />The Board met in regular,session at 10 A. M. All members present. <br />Petition for Keer street Grade, Curb & Walk-iN,-ferred to the Engineer for <br />Specifications. <br />Petition filed for Grade, Curb & Walk on Fassnacht avenue from Walnut street to <br />Johnson street. Referred to the Engineer for Speeifacations. <br />Petition filed for Grade, Curb & Walk on the West side of Eddy street from the <br />Grand Trunk R. R. to Sample street. Referred to the engineer for Specifications. <br />Petition filed for light at the corner of Bartlett street and Marion Boulevard. <br />Bond of Joseph Swiatowy filed and approved for Lincoln street Grade, Curb & Walk. <br />Contract signed for same. <br />Petition filed for Grade, Curb & Walk to be done by the Grand Trunk R. R. Co on a <br />newly appropriated strip of ground on Division street. Referred to the City Attorney. <br />Plat Of Rockstroh's Subdivision filed and referred to the Engineer. <br />Contract awarded to C. L. Copp for a timber crib at the end of the LaSalle avenue <br />sewer. Con�r�rc7`'��"i'a e (Ao'o aT oo,) <br />Bids were opened and referred to the Engineer for tabulation for the following <br />work;- <br />Gsade, Curb & Walk on William street, Harper Court and River avenue, Grade & Curb <br />on Notre Dame street. <br />Bids were opened and referred to the Engineer for tabulation for No. 3 and No. 9 <br />Hose Houses. <br />H. G. Christman & Co were given permission to temporarily close a portion of the <br />lst alley West of Drain street from Colfax avenue North the length of the Elks property <br />owing to the construction of the Elks Temple. <br />Clerk was instructed to notify Architects to submit plans and specifications for <br />the plumbing and wiring of the No 3 and No. 8 Hose Houses. <br />