My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA -Design Srvs. Martin Luther King Jr. Community Dream Center Proj No. 121-066 - Meticulous Design Architecture, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA -Design Srvs. Martin Luther King Jr. Community Dream Center Proj No. 121-066 - Meticulous Design Architecture, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 8:44:17 AM
Creation date
11/10/2021 8:43:52 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 11 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />22.Assistance to Owner in training Owner’s staff to operate and maintain Project equipment <br />and systems. <br />23.Assistance to Owner in developing procedures for (a) control of the operation and <br />maintenance of Project equipment and systems, and (b) related record-keeping. <br />24.Overtime work requiring higher than regular rates. <br />25. Other services performed or furnished by Engineer not otherwise provided for in this <br />Agreement. <br />A2.02 Additional Services Not Requiring Owner’s Written Authorization <br />A.Engineer shall advise Owner in advance that Engineer is will immediately commence to perform <br />or furnish the Additional Services of the types listed below. For such Additional Services, <br />Engineer need not request or obtain specific advance written authorization from Owner. Engineer <br />shall cease performing or furnishing such Additional Services upon receipt of written notice from <br />Owner. <br />1.Services in connection with work change directives and change orders to reflect changes <br />requested by Owner. <br />2.Services in making revisions to Drawings and Specifications occasioned by the acceptance <br />of substitute materials or equipment other than “or-equal” items; services after the award of <br />the Construction Contract in evaluating and determining the acceptability of a proposed "or <br />equal" or substitution which is found to be inappropriate for the Project; evaluation and <br />determination of an excessive number of proposed "or equals" or substitutions, whether <br />proposed before or after award of the Construction Contract. <br />3.Services resulting from significant delays, changes, or price increases occurring as a direct <br />or indirect result of materials, equipment, or energy shortages. <br />4.Additional or extended services during construction made necessary by (1) emergencies or <br />acts of God endangering the Work (advance notice not required), (2) the presence at the <br />Site of any Constituent of Concern or items of historical or cultural significance, (3) Work <br />damaged by fire or other cause during construction, (4) a significant amount of defective, <br />neglected, or delayed work by Contractor, (5) acceleration of the progress schedule <br />involving services beyond normal working hours, or (6) default by Contractor. <br />5.Services (other than Basic Services during the Post-Construction Phase) in connection with <br />any partial utilization of any part of the Work by Owner prior to Substantial Completion. <br />6.Evaluating an unreasonable claim or an excessive number of claims submitted by <br />Contractor or others in connection with the Work. <br />7.Services during the Construction Phase rendered after the original date for completion of <br />the Work referred to in A1.05.B.
The URL can be used to link to this page
Your browser does not support the video tag.