My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - 100 S. Michigan Tree Grates Proj No. 121-037 - The Robert Henry Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Award Quotations & Proposals
>
Award Quote - 100 S. Michigan Tree Grates Proj No. 121-037 - The Robert Henry Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 8:35:52 AM
Creation date
11/10/2021 8:35:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER-OFFICE MEMORANDUM <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Laura Hensley, Clerk, Board of Public Works <br />FROM: Finn Cavanaugh, Project Engineer, Division of Engineering <br />SUBJECT: Award Quote Memo 121-037 100 S Michigan Tree Grates <br />DATE: October 28, 2021 <br />On October 26, 2021, the Board of Public Works opened and read quotes for the above project. <br />The quoters ranked as follows: <br />Quoter Total Quote Amount <br />1.The Robert Henry Corporation $75,724.23 <br />2.Acorn Landscaping, LLC $101,244.36 <br />3.Fuerbringer Landscaping & Design Inc.(incomplete quote) <br />Engineering did not find any substantial calculation errors in the submitted bids. The Robert <br />Henry Corporation rounded off cents in their quote tab, which read a total amount of <br />$75,724.00. This has been corrected in the award memo with an additional $0.23 to accurately <br />reflect the unit costs submitted for each line item. <br />The quote submitted by Fuerbringer Landscaping & Design Inc. was deemed non-responsive, <br />as the submission contained only one page and omitted required documents such as the Non- <br />Collusion Affidavit and MWBE forms. The quote total submitted by Fuerbringer was incomplete <br />as only one line item was given a unit price and total cost. <br />The Office of Diversity and Inclusion reviewed the MWBE goal-meeting documentation <br />submitted by the Robert Henry Corporation and found that their quote met the subcontracting <br />goals set by the terms of the quote documents. All other required documentation was provided <br />and complete. <br />Engineering recommends award of the Project to the lowest responsive and responsible quoter, <br />The Robert Henry Corporation, in the amount of $75,724.23. Engineering recommends
The URL can be used to link to this page
Your browser does not support the video tag.