Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />ADDENDUM No. 1 <br />Project Name: Potawatomi Zoo Parking Lot <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />ALTERNATE #1 <br />120-014 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Tree, Remove, 30 in. <br />1 <br />EA <br />$ 1,200.00 <br />$ 1,200.00 <br />2 <br />Erosion Control <br />1 <br />LS <br />$ 2,282.27 <br />$ 2,282.27 <br />3 <br />Compacted Aggregate, No. 53 <br />82 <br />TON <br />$ 37.97 <br />$ 3,113.54 <br />4 <br />Milling, Asphalt, 1.5 in. <br />6 <br />SYS <br />$ 107.05 <br />$ 642.30 <br />5 <br />HMA, Type "B", Surface <br />12 <br />TON <br />$ 145.00 <br />$ 1,740.00 <br />6 <br />HMA, Type "B", Intermediate <br />10 <br />TON <br />$ 129.00 <br />$ 1,290.00 <br />7 <br />Joint Adhesive, Surface <br />84 <br />LFT <br />$ 2.50 <br />$ 210.00 <br />8 <br />Joint Adhesive, Intermediate <br />84 <br />LFT <br />$ 2.50 <br />$ 210.00 <br />9 <br />Asphalt Material for Tack Coat <br />1 <br />TON <br />$ 560.00 <br />$ 560.00 <br />10 <br />Mulch Seeding, U <br />58 <br />SYS <br />$ 9.55 <br />$ 553.90 <br />11 <br />Topsoil <br />10 <br />CYS <br />$ 432.31 <br />$ 4,323.10 <br />12 <br />Pipe, Circular, 30 in., Perforated <br />30 <br />LFT <br />$ 107.35 <br />$ 3,220.50 <br />13 <br />Structure, Drywell, 1,800 Gal. <br />2 <br />EA <br />$ 12,030.62 <br />$ 24,061.24 <br />14 <br />Structure Backfill, for Perforated Pipe <br />12 <br />CYS <br />$ 432.81 <br />$ 5,193.72 <br />15 <br />Structure Backfill, Type 1 <br />23 <br />CYS <br />$ 130.96 <br />$ 3,012.08 <br />16 <br />Geotextile for Drywell and Pipes <br />157 <br />SYS <br />$ 9,73 <br />$ 1,527.61 <br />17 <br />Aggregate No. 8 for Drywell <br />18 <br />CYS <br />$ 246.50 <br />$ 4,437.00 <br />18 <br />Pipe Catch Basin, 24 in. <br />1 <br />EA <br />$ 2,591.59 <br />$ 2,591.59 <br />19 <br />Pipe, Type 2, Circular, 12 in. <br />155 <br />LFT <br />$ 58.23 <br />$ 9,025.65 <br />ALTERNATE #1 TOTAL $69,194.50 <br />Version 08/25/2021 Contractor's Bid for Public Works - 9 <br />