Laserfiche WebLink
Rieth-Riley Construction Co., Inc. <br />Equipment List <br />3/31/2020 <br />Acquired New or <br />Asset q Description <br />Acquisition Date <br />q <br />Used <br />Cost <br />Accum Depr <br />NBV <br />PCF0000047 BIN AGGREGATE <br />6/24/1984 <br />N <br />13,165.70 <br />11,849,13 <br />1,316,57 <br />PCF0000048 BIN AGGREGATE <br />6/24/1984 <br />N <br />13,165.69 <br />11,849.12 <br />1,316.57 <br />PCF0000050 BIN AGGREGATE <br />7/10/1979 <br />N <br />30,000.00 <br />21,000.00 <br />9,000.00 <br />PCF0000051 BIN COLD FEED <br />4/1/1992 <br />N <br />25,780.42 <br />23,202.38 <br />2,578.04 <br />PCF0000052 BIN COLD FEED <br />4/1/1992 <br />N <br />25,780.42 <br />23,202,38 <br />2,578.04 <br />PCF0000053 BIN COLD FEED (4) <br />5/30/1998 <br />N <br />100,670.13 <br />90,603,12 <br />10,067,01 <br />PCF0000054 BIN AGGREGATE <br />6/24/1984 <br />N <br />13,165.70 <br />11,849,13 <br />1,316.57 <br />PCF0000055 BIN AGGREGATE <br />6/24/1984 <br />N <br />13,165.70 <br />11,849.13 <br />1316,57 <br />PCF0000056 BIN COLD FEED <br />8/29/1988N' <br />6,642.14 <br />5,977,93 <br />,664.21 <br />PCF0000057 BIN COLD FEED <br />5/13/1993 <br />N <br />30,111.27 <br />27,100,15 <br />3,011.12 <br />PCF0000058 BIN HOPPER <br />3/31/2005 <br />U <br />19,500.00 <br />17,550,00 <br />1,950.00 <br />PCP0000074 STARTING GEAR <br />5/18/2002 <br />N <br />45,885.05 <br />45,885,05 <br />PCH0000001 TRAILER CONTROL <br />3/31/2005 <br />U <br />20,200.00 <br />18,180,00' <br />2,020.00 <br />PCH0000002 CONTROL •HOUSE <br />5/2/1992 <br />N <br />177,577.00 <br />159,819.30 <br />17 757.70 <br />PCH0000003 CONTROL HOUSE <br />11/29/2008 <br />U <br />3,405,00 <br />3,405.00 <br />PCHOO00004 CONTROLHOUSE <br />2/25/2000 <br />N <br />125,645.49 <br />111,570,71 <br />14,074.78 <br />PCH0000005 TRAILER CONTROL <br />4/2/1990 <br />N <br />15,161.87 <br />15,161.87 <br />PCH0060006 TRAILER CONTROL <br />4/24/1991 <br />N <br />15,650,00 <br />15,650,00 . <br />PCH0000007 PLANT -BASE TRAILER <br />7/29/.1995 <br />U <br />40,000.00. <br />36,000,00 <br />4,000,00 <br />PCH0000008 PLANT-CEMENTSECrION TRA <br />7/29/1995 <br />U <br />30,000.00 <br />27,000,00 <br />3,000,00 <br />PCH0000009 TRAILER CONTROL <br />7/29/1995 <br />U <br />70,000,00 <br />63,000,00 <br />7,000.00 <br />PCH0000010 CONTROLHOUSE <br />3/16/2009 <br />U <br />85,000.00 <br />56,100,00 <br />28,900,00 <br />PCH0000011 CONTROL HOUSE <br />10/14/1986 <br />N <br />18,813.60 <br />16,932.24 <br />1,881.36 <br />PCHOOOOO13 CONTROLHOUSE <br />3/16/2009 <br />U <br />20,000,00 <br />13,200,00 <br />6,800.00 <br />PCHOOOOO14 CONTROLHOUSE <br />8/9/2005 <br />U <br />16,682.07 <br />16,682.07 <br />PCH0000015 CONTROL HOUSE <br />3/16/2009 <br />U <br />20,000,00 <br />13,200.00 <br />6,800.00 <br />PCH6000016 CONTROLHOUSE <br />7/27/1983 <br />N <br />13,350.00 <br />12,015,00 <br />1,335.00 <br />PCH0000017 CONTROL HOUSE <br />7/27/1983 <br />N <br />19,230.75 <br />17,307,67 <br />1,923.08 <br />PCH0000019 CONTROLHOUSE <br />9/21/1999 <br />U <br />44,330.29 <br />39,897,26 <br />4,433.03 <br />PCH0000021 TRAILER CONTROL <br />4/2/2007 <br />U <br />21,734.21 <br />21,734.21 <br />PCH0000022. TRAILER CONTROL <br />3/31/2005 <br />N <br />5,000,00 <br />4,500.00 <br />500.00 <br />PCH0000023 TRAILER CONTROL <br />4/18/2006 <br />U <br />19,538.18 <br />18,236,04 <br />1,302.14 <br />PCM0000001 COMPRESSORAIR <br />3/31/2005 <br />U <br />320,00 <br />288.00 <br />PCM0000002 COMPREssoR AIR <br />6/21/2010 <br />N <br />11,100.00 <br />11,100.00 <br />32,00 <br />- <br />PCM0000003 COMPRESSOR AIR <br />3/14/2013 <br />N <br />28,195.07 <br />28,195,07 <br />PCKCOO0004 COMPRESSOR AIR 75 HP <br />6/2/2017 <br />N <br />28,632.00 <br />8,321.84 <br />20,310.16 <br />PCM0000005 COMPRESSOR AIR <br />4/12/1996 <br />N <br />8,532.10 <br />8,532,10 <br />PCM0000006 COMPRESSOR 75 HP <br />4/1/2016 <br />N <br />27,850.00 <br />22,280,04 <br />5,569,96 <br />PCM0000007 COMPRESSOR -352 CFM <br />7/5/2018 <br />N <br />25,215,00 <br />4,622.74 <br />20,592.26 <br />PCM0000008 COMPRESSOR AIR 75 HP <br />4/1/2017 <br />N <br />26,965.00 <br />8,089,56 <br />18,875,44 <br />PCM0000009 COMPRESSOR AIR <br />4/28/2010 <br />N <br />'4,040.00 <br />4,040.00 <br />PCM0000011 COMPRESSOR 352 CFM <br />411/2018 <br />N <br />32,734.59 <br />6,546,96 <br />26,187.63 <br />PCM0000012 COMPRESSORAIR <br />3/16/2009 <br />U <br />2,000,00 <br />1,320.00 <br />680.00 <br />PCMOCOOO14 COMPRESSORAIR <br />3/16/2009 <br />U <br />1,000.00 <br />660.00 <br />340.00 <br />PCM0000015 COMPRESSOR AIR 75 HP <br />4/30/2017 <br />N <br />27,714.37 <br />8,112.17 <br />19,602,20 <br />PCM0000016 COMPRE550RAIR <br />3/16/2009 <br />U <br />700,00 <br />462.00 <br />238.00 <br />PCM0000019 AIR COMPRESSOR 75 HP <br />1/1/2019 <br />N <br />32,826,58 <br />4,103,25 <br />28,723.33 <br />PCM0000020 REGENERATIVE AIR DRYER <br />7/31/2001 <br />N <br />8,388,51 <br />7,549,65 <br />838.86 <br />PCM0000021 AIR COMPRESSOR <br />3/8/2019 <br />N <br />32,032.35 <br />2,936,34 <br />29,096.01 <br />PC90000001 CRUSHER SYSTEM <br />5/15/2004 <br />N <br />119,384.61 <br />119,384.61 <br />PCR0000002 CRUSHER SYSTEM <br />6/30/2000 <br />N <br />621,392,22 <br />559,253.00 <br />62,139.22 <br />PCR0000003 BREAKER RECYCLE <br />4/30/2018 <br />N <br />73,611.29 <br />73,611,29 <br />PCR0000004 CRUSHER RECYCLE <br />6/22/1991 <br />N <br />23,236.11 <br />20,912.50 <br />2,323.61 <br />PCR0000005 BREAKER RECYCLE <br />4/1/2016 <br />N <br />41,395.87 <br />16,558,44 <br />24,837,43 <br />PCR0000006 BREAKER RECYCLE <br />4/1/2016 <br />N <br />50,548,09 <br />20,219,16 <br />30,328.93 <br />PCR0000007 BREAKER RECYCLE <br />4/1/2016 <br />N <br />42,778,78 <br />17,111.52 <br />25,667.26 <br />PCR0000008 CRUSHER SYSTEM <br />4/22/2006 <br />N <br />230,469.42 <br />230,469.42 <br />PCR0400009 BREAKER RECYCLE <br />4/1/2018 <br />N <br />47,907,55 <br />9,581.52 <br />38,326,03 <br />PCR0000010 BREAKER RECYCLE <br />6/3/2018 <br />N <br />43,282,87 <br />7,935.18 <br />35,347.69 <br />PCR0000012 CRUSHER <br />4/1/2006 <br />U <br />18,000.00 <br />15,120.00 <br />2,880,00 <br />PCR0000013 CRUSHER RECYCLE <br />4/1/1992 <br />N <br />18,365.00 <br />16,528,50 <br />1,836.50 <br />PCR0000015 RECYCLE BREAKER <br />2/18/2019 <br />N <br />87,200,32 <br />7,993.37 <br />79,206,95 <br />PCROd00016 RECYCLE BREAKER <br />2/18/2019 <br />N <br />49,318.57 <br />4,520,89 <br />44,797 68 <br />PDC0000001 CONVEYOR DRAG <br />9/29/2008 <br />N <br />104,000,00 <br />104,000.00 <br />PDC0000002 CONVEYOR DRAG <br />4/15/2010 <br />N <br />77,402.10 <br />77,402.10 <br />PD00000003 CONVEYOR DRAG <br />4/22/2005 <br />N <br />171,735,19 <br />171,735,19 <br />PDC0000004 CONVEYOR DRAG <br />5/4/2014 <br />N <br />352,870,10 <br />208,781,30 <br />144,088,80 <br />POCOC00005 CONVEYOR DRAG <br />3/16/2009 <br />U <br />89,000,00 <br />58,740.00 <br />30,260.00 <br />P000000006 CONVEYOR DRAG SLAT CROSS <br />4/30/2018 <br />N <br />.73,988,00 <br />14,249,63 <br />59,738,37 <br />POCOOO0007 CONVEYOR DRAG <br />3/16/2009 <br />U <br />42,000,00 <br />31,185,00 <br />10,815,00 <br />PDC0000008 CONVEYOR DRAG <br />3/16/2009 <br />U <br />69,000.00 <br />45,540,00 <br />23,460,00 <br />POCOOOGO09 CONVEYOR DRAG <br />5/18/2002 <br />N <br />136,530,61 <br />136,530,61 <br />PDC0000010 STAIR/HANDRAIL FOR DRAG CO <br />6/16/1994 <br />N <br />7,980.00 <br />7,182.00 <br />PDD0000001 DRYER DRUM <br />3/3/2012 <br />U <br />266,225,00 <br />127,788,36 <br />798.00 <br />138,436,64 <br />PODOOO0002 DRUM DRYER <br />7/2/2016 <br />N <br />294,789.47 <br />112,663.80 <br />182,125,67 <br />PDS0000001 BURNER <br />3/31/2005 <br />U <br />14,650.00 <br />13,185.00 <br />1,465,00 <br />PDS0000002 TANK BURNER FUEL <br />3/3112005 <br />U <br />13,500,00 <br />12,150.00 <br />11350,00 <br />