Laserfiche WebLink
Project Name: <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />BASE BID <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />ADDENDUM No. 1 <br />Potawatomi Zoo Parking Lot <br />120-014 <br />November 9, 2021 <br />llklie44 6 617i <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />$ 8,500.00 <br />$ 8,500.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />$ 25,985.00 <br />$ 25,985.00 <br />3 <br />Clearing Site and Demolition <br />1 <br />LS <br />$ 16,241.82 <br />$ 16,241.82 <br />4 <br />Tree, Remove, 30 in. <br />7 <br />EA <br />$ 1,200.00 <br />$ 8,400.00 <br />5 <br />Sign and Supports, Remove, and Reset <br />4 <br />EA <br />$ 266.57 <br />$ 1,066.28 <br />6 <br />Structure, Drywell, Remove <br />1 <br />EA <br />$ 4,488.37 <br />$ 4,488.37 <br />7 <br />Concrete Pad, Remove <br />4 <br />SYS <br />$ 194.02 <br />$ 776.08 <br />8 <br />Excavation, Common <br />810 <br />CYS <br />$ 35.97 <br />$ 29,135.70 <br />9 <br />Borrow <br />50 <br />CYS <br />$ 78.87 <br />$ 3,943.50 <br />10 <br />Stormwater Management Budget <br />3,565 <br />DOL <br />$ 1.13 <br />$ 4,028.45 <br />11 <br />Stormwater Implementation <br />1 <br />LS <br />$ 4,915.40 <br />$ 4,915.40 <br />12 <br />Subgrade Treatment, Type III <br />2,342 <br />SYS <br />$ 3.31 <br />$ 7,752.02 <br />13 <br />Structure Backfill for Perforated Pipe <br />s - <br />1 011 <br />CYS <br />$ 167.11 <br />$ 51,971.21 <br />14 <br />Geotextile for Drywell and Pipes <br />1,772 <br />SYS <br />$ 5.55 <br />$ 9,834.60 <br />15 <br />Aggregate No. 8 for Drywell <br />109 <br />CYS <br />$ 232.76 <br />$ 25,370.84 <br />16 <br />Compacted Aggregate, No. 53 <br />684 <br />TON <br />$ 41.96 <br />$ 28,700.64 <br />17 <br />Milling, Asphalt, 1.5 in. <br />511 <br />SYS <br />$ 16.56 <br />$ 8,462.16 <br />18 <br />HMA, Type "B", Surface <br />260 <br />TON <br />$ 145.00 <br />$ 37,700.00 <br />19 <br />HMA, Type "B", Intermediate <br />378 <br />TON <br />$ 129.00 <br />$ 48,762.00 <br />20 <br />Joint Adhesive, Surface <br />224 <br />LFT <br />$ 2.50 <br />$ 560.00 <br />21 <br />Joint Adhesive, Intermediate <br />224 <br />LFT <br />$ 2.50 <br />$ 560.00 <br />22 <br />Seal Coat, 2 <br />11,116 <br />SYS <br />$ 1.35 <br />$ 15,006.60 <br />23 <br />Asphalt Material for Tack Coat <br />1 <br />TON <br />$ 560.00 <br />$ 560.00 <br />24 <br />Sidewalk, Concrete, 4 in. <br />22 <br />SYS <br />$ 60.00 <br />$ 1,320.00 <br />25 <br />Curb, Standard, Concrete <br />637 <br />LFT <br />$ 35.00 <br />$ 22,295.00 <br />26 <br />Mobilization and Demobilization for <br />Seeding <br />1 <br />EA <br />$ 400.00 <br />$ 400.00 <br />27 <br />Erosion Control Blanket <br />396 <br />SYS <br />$ 7.05 <br />$ 2,791.80 <br />Version 08/25/2021 Contractor's Bid for Public Works - 7 <br />