My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Wastewater Permit - Honeywell International Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Licenses & Permits
>
Industrial Wastewater Permit - Honeywell International Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:32:58 AM
Creation date
10/27/2021 9:32:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Recommendations
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />18 <br />Honeywell International Industrial Discharge Permit <br />H. Flow Measurement Devices <br /> <br />1. The permittee shall submit a Flow Measurement Plan (FMP) within 90 days of the issuance of <br />this permit or report as to whether the existing plan is still being implemented. The FMP shall <br />describe, at a minimum, how the permittee will measure and record water and wastewater flow <br />in their facility, including how wastewater discharged to the sewer will be measured, and shall <br />include the certification statement found in Part III (A) (4) signed by the Authorized <br />Representative [see Part IV (B) (15)]. <br /> <br />2. When internal process flow measurement is requested by the Director, the FMP shall also <br />describe how the flow of any internal processes will be measured. The FMP shall be subject to <br />review by the Control Authority. <br /> <br />3. The permittee shall measure and report the wastewater discharge flow for the duration of each <br />sampling event. Totalized daily flows shall also be submitted with the Periodic Compliance <br />Report (PCR). For batch discharges, the permittee shall report the date and the volume of each <br />and every batch discharge. Each PCR shall include all flow measurements for the entire <br />monitoring period covered in the report. <br /> <br />4. The permittee shall calibrate any flow measurement device as needed and at least once every <br />twelve months. The calibration shall be performed by a qualified individual, with the appropriate <br />equipment, and by a method acceptable to the Control Authority. The permittee shall submit all <br />records of calibration to the Control Authority. <br /> <br />5. Spare level sensing and totalizing/recording instrumentation, and sampling repair parts shall be <br />available for immediate installation upon discovery that flow measurement devices are not <br />operating properly, or as described in the FMP. <br /> <br />6. The permittee shall not, at any time, remove, alter, or change any of the flow measurement <br />devices described in the FMP. Any proposed change to the FMP shall be submitted to the <br />Control Authority for approval. If the permittee is unable to measure flow as described in the <br />FMP, the permittee shall immediately notify the Control Authority. <br /> <br />I. Reporting Information and Correspondence with the Permittee <br /> <br />1. Unless otherwise provided in this permit, all correspondence related to this wastewater discharge <br />permit shall be sent to the Control Authority at this address: <br /> <br />City of South Bend <br />Division of Environmental Services <br />Industrial Pretreatment Group <br />3113 Riverside Dr. <br />South Bend IN 46628 <br /> <br />2. In the event that an oral notification is required due to a spill or slug to the sewer, or other <br />emergency, the permittee shall call 574-277-8515 and dial zero (0) to reach an operator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.