Laserfiche WebLink
<br />11 <br />Honeywell International Industrial Discharge Permit <br /> <br />PART II - MONITORING REQUIRMENTS <br /> <br />A. Monitoring Frequency <br /> <br />1. The following parameters shall be monitored at the frequency and with the sampling type stated <br />below. All measurements, tests, and analyses of the characteristics of water and wastes to which <br />reference is made in this permit shall be conducted using the methods and procedures approved <br />in 40 CFR 136 and amendments thereto, unless otherwise specified in an applicable Categorical <br />Pretreatment Standard. <br /> <br />The following parameters shall be monitored at sample sites #002 & #005: <br />Parameter Sampling Frequency Sampling Type <br />Arsenic (mg/L) Semiannual Composite <br />BOD5 (mg/L) Semiannual Composite <br />Cadmium (mg/L) Semiannual Composite <br />Cyanide (mg/L) Semiannual Grab <br />Lead (mg/L) Semiannual Composite <br />Silver (mg/L) Semiannual Composite <br />Mercury (mg/L) Semiannual Grab <br />Nickel (mg/L) Semiannual Composite <br />Oil and grease (mg/L) Semiannual Grab <br />Oil and Grease TPH (mg/L) Semiannual Grab <br />Phosphorus (mg/L) Semiannual Composite <br />TSS (mg/L) Semiannual Composite <br />TTO (mg/L) Semiannual Grab <br />pH (SU) Monthly Grab <br />Ammonia, nitrogen (mg/L) Monthly Composite <br />Chromium (mg/L) Monthly Composite <br />Copper (mg/L) Monthly Composite <br />Zinc (mg/L) Monthly Composite <br />Flow Monthly (gal) Monthly Continuously <br />Flow, total (gpd) Daily Continuously <br />See Flow Measurement Requirements referenced in Part III - Reporting Requirements. <br /> <br /> <br /> <br />