My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Study Phase to Design Wastewater Treatment Plant CSO Storage Tank - American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Study Phase to Design Wastewater Treatment Plant CSO Storage Tank - American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:22:45 AM
Creation date
10/27/2021 9:22:35 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />1.amounts due Engineer will be increased at the rate of 1.0% per month (or the maximum <br />rate of interest permitted by law, if less) from said thirtieth day; and <br />2.Engineer may, after giving seven days written notice to Owner, suspend services under <br />this Agreement until Owner has paid in full all non-disputed amounts due for services, <br />expenses, and other related charges. Owner waives any and all claims against Engineer <br />for any such suspension. <br />C.Disputed Invoices: If Owner contests an invoice, Owner shall promptly advise Engineer of the <br />specific basis for doing so, may withhold only that portion so contested, and must pay the <br />undisputed portion. <br />D.Legislative Actions: If after the Effective Date any governmental entity takes a legislative action <br />that imposes taxes, fees, or charges on Engineer’s services or compensation under this Agreement, <br />then the Engineer may invoice such new taxes, fees, or charges as a Reimbursable Expense to <br />which a factor of 1.0 shall be applied. Owner shall reimburse Engineer for the cost of such <br />invoiced new taxes, fees, and charges; such reimbursement shall be in addition to the <br />compensation to which Engineer is entitled under the terms of Exhibit C. <br />ARTICLE 5 – OPINIONS OF COST <br />5.01 Opinions of Probable Construction Cost <br />A.Engineer’s opinions of probable Construction Cost are to be made on the basis of Engineer’s <br />experience and qualifications and represent Engineer’s best judgment as an experienced and <br />qualified professional generally familiar with the construction industry. However, because <br />Engineer has no control over the cost of labor, materials, equipment, or services furnished by <br />others, or over contractors’ methods of determining prices, or over competitive bidding or market <br />conditions, Engineer cannot and does not guarantee that proposals, bids, or actual Construction <br />Cost will not vary from opinions of probable Construction Cost prepared by Engineer. If Owner <br />requires greater assurance as to probable Construction Cost, Owner must employ an independent <br />cost estimator as provided in Exhibit B. <br />5.02 Designing to Construction Cost Limit <br />A.If a Construction Cost limit is established between Owner and Engineer, such Construction Cost <br />limit and a statement of Engineer’s rights and responsibilities with respect thereto will be <br />specifically set forth in Exhibit F, “Construction Cost Limit,” to this Agreement. <br />5.03 Opinions of Total Project Costs <br />A.The services, if any, of Engineer with respect to Total Project Costs shall be limited to assisting the <br />Owner in collating the various cost categories which comprise Total Project Costs. Engineer <br />assumes no responsibility for the accuracy of any opinions of Total Project Costs. <br />DocuSign Envelope ID: 1C4AA711-DA0B-418C-90FE-56D629C93881
The URL can be used to link to this page
Your browser does not support the video tag.