Page 13 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />16.Providing assistance in responding to the presence of any Constituent of Concern at the <br />Site, in compliance with current Laws and Regulations. <br />17.Preparing Record Drawings showing appropriate record information based on Project <br />annotated record documents received from Contractor, and furnishing such Record <br />Drawings to Owner. <br />18.Preparation of operation and maintenance manuals. <br />19.Preparing to serve or serving as a consultant or witness for Owner in any litigation, <br />arbitration, or other dispute resolution process related to the Project. <br />20.Providing more extensive services required to enable Engineer to issue notices or <br />certifications requested by Owner. <br />21.Assistance in connection with the adjusting of Project equipment and systems. <br />22.Assistance to Owner in training Owner’s staff to operate and maintain Project equipment <br />and systems. <br />23.Assistance to Owner in developing procedures for (a) control of the operation and <br />maintenance of Project equipment and systems, and (b) related record-keeping. <br />24.Overtime work requiring higher than regular rates. <br />25.Other services performed or furnished by Engineer not otherwise provided for in this <br />Agreement. <br />A2.02 Additional Services Not Requiring Owner’s Written Authorization <br />A.Engineer shall advise Owner in advance that Engineer is will immediately commence to perform or <br />furnish the Additional Services of the types listed below. For such Additional Services, Engineer <br />need not request or obtain specific advance written authorization from Owner. Engineer shall cease <br />performing or furnishing such Additional Services upon receipt of written notice from Owner. <br />1.Services in connection with work change directives and change orders to reflect changes <br />requested by Owner. <br />2.Services in making revisions to Drawings and Specifications occasioned by the acceptance <br />of substitute materials or equipment other than “or-equal” items; services after the award of <br />the Construction Contract in evaluating and determining the acceptability of a proposed "or <br />equal" or substitution which is found to be inappropriate for the Project; evaluation and <br />determination of an excessive number of proposed "or equals" or substitutions, whether <br />proposed before or after award of the Construction Contract. <br />3.Services resulting from significant delays, changes, or price increases occurring as a direct <br />or indirect result of materials, equipment, or energy shortages. <br />DocuSign Envelope ID: 1C4AA711-DA0B-418C-90FE-56D629C93881