My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Study Phase to Design Wastewater Treatment Plant CSO Storage Tank - American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Study Phase to Design Wastewater Treatment Plant CSO Storage Tank - American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:22:45 AM
Creation date
10/27/2021 9:22:35 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 11 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />3.Perform or provide the following additional Post-Construction Phase tasks or deliverables: <br />[Here list any such tasks or deliverables] <br />Visit site after first major rain event after project completion to observe operations and <br />mechanical systems. <br />B.The Post-Construction Phase services may commence during the Construction Phase and, if not <br />otherwise modified in this Exhibit A, will terminate twelve months after the commencement of the <br />Construction Contract’s correction period. <br />A1.07 Schedule <br />The proposed design and bid services will be completed within 18 months after Notice to Proceed <br />(NTP). A breakdown of the preliminary schedule is as follow: <br />Contract Award October 12, 2021 <br />Study Phase October 13, 2021 - December 31, 2021 (three months) <br />Preliminary Design January 1, 2022 - June 30, 2022 (six months) <br />Final Design July 1, 2022 - December 31, 2022 (five months) <br />Permitting and Bidding (anticipate 8-10 weeks <br /> time needed to bid) January 1, 2023 - April 1, 2023 (three months) <br />Anticipated Construction Notice to Proceed June 1, 2023 <br />Design 18 months <br />Construction Schedule TBD <br />PART 2 – ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner’s Written Authorization <br />A.If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services <br />of the types listed below. <br />1.Preparation of applications and supporting documents (in addition to those furnished under <br />Basic Services) for private or governmental grants, loans, or advances in connection with <br />the Project; preparation or review of environmental assessments and impact statements; <br />review and evaluation of the effects on the design requirements for the Project of any such <br />statements and documents prepared by others; and assistance in obtaining approvals of <br />authorities having jurisdiction over the anticipated environmental impact of the Project. <br />2.Services to make measured drawings of or to investigate existing conditions or facilities, or <br />to verify the accuracy of drawings or other information furnished by Owner or others. <br />3.Services resulting from significant changes in the scope, extent, or character of the portions <br />of the Project designed or specified by Engineer or its design requirements including, but <br />not limited to, changes in size, complexity, Owner’s schedule, character of construction, or <br />method of financing; and revising previously accepted studies, reports, Drawings, <br />DocuSign Envelope ID: 1C4AA711-DA0B-418C-90FE-56D629C93881
The URL can be used to link to this page
Your browser does not support the video tag.